1208 2 Avenue,Manhattan, NY 10065

166 Units

Built in 1959

16 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
42 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 12 violations which is 0.07 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
7Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
5Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
0Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Jun 30, 2018Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNot complied with
Jun 30, 2018Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st storyNot complied with
Jun 30, 2018Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st storyNot complied with
Mar 20, 2016Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 7j, 7th story, 2nd apartment from west at northNot complied with
Mar 20, 2016Section 27-2005 adm code properly repair the broken or defective paint shut lower and upper sash window in the 1st room from east located at apt 7j, 7th story, 2nd apartment from west at northNot complied with
Mar 20, 2016Section 27-2026 adm code repair the leaky and/or defective faucets wash basin in the bathroom located at apt 7j, 7th story, 2nd apartment from west at northNot complied with
Mar 20, 2016Section 27-2026 adm code repair the leaky and/or defective faucets sink in the kitchen located at apt 7j, 7th story, 2nd apartment from west at northNot complied with

Property Owners and Associates

Alper Daglioglu
Head Officer
4.8(1)

2 Properties

226 Units

John Devall
Officer
4.6(2)

2 Properties

357 Units

Lauren Svenningsen
Officer
4.6(2)

2 Properties

357 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Had a great experience!
Former Tenant
Pros:
Overall a great experience. Everyone (c) openig...
Cons:
My apartment faced Queens bridge (c) openigloo ...
Advice to owner:
Nothing to add