320 St Nicholas Avenue,Manhattan, NY 10027

47 Units

Built in 1900

7 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
259 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 73 violations which is 1.55 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
25Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
32Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
16Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Nov 11, 2023§ 27-2005 hmc: properly repair or replace the broken or defective upper escutcheon plate at heat riser in the bathroom located at apt 4b, 4th story, 2nd apartment from west at northCiv14 mailed
Nov 06, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the kitchen located at apt 4b, 4th story, 2nd apartment from west at northCiv14 mailed
Feb 16, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from north at west located at apt 6f, 6th story, 2nd apartment from east at southNov sent out
Feb 16, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchen located at apt 6f, 6th story, 2nd apartment from east at southNov sent out
Jul 12, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the private hallway , the kitchen located at apt 2b, 2nd story, 2nd apartment from west at northNov sent out
Jun 07, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt 5e, 5th story, 1st apartment from east at southNot complied with
May 17, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the west wall in the bathroom located at apt 6d, 6th story, 4th apartment from west at northNov sent out
May 17, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall in the private hallway located at apt 6d, 6th story, 4th apartment from west at northNov sent out
Mar 23, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the kitchen located at apt 4b, 4th story, 2nd apartment from north at eastNot complied with
Mar 23, 2022Section 27-2005 adm code properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 6d, 6th story, 4th apartment from west at northNov sent out
Feb 14, 2022Section 27-2005 adm code paint metal in accordance with dept. regulation the steam riser in the bathroom located at apt 5a, 5th story, 1st apartment from west at northNov sent out
Feb 14, 2022Section 27-2005 adm code paint metal in accordance with dept. regulation the steam riser in the 1st room from north at east located at apt 5a, 5th story, 1st apartment from west at northNov sent out
Feb 14, 2022Section 27-2005 adm code paint metal in accordance with dept. regulation the steam riser in the 2nd room from north located at apt 5a, 5th story, 1st apartment from west at northNov sent out
Jun 30, 2021Section 27-2005 adm code properly repair with similar material the broken or defective grout at tiles at north wall in the bathroom located at apt 1c, 1st story, 4th apartment from west at northNot complied with
Jun 30, 2021Section 27-2005 adm code properly secure the loose escutcheon plate at floor around heat riser pipe in the bathroom located at apt 1c, 1st story, 4th apartment from west at northNot complied with
Apr 07, 2021Section 27-2005 adm code properly repair the broken or defective liight switch at west wall in the kitchen located at apt 6d, 6th story, 4th apartment from west at northNot complied with
Apr 07, 2021Section 27-2005 adm code refit entrance door in the bathroom located at apt 6d, 6th story, 4th apartment from west at northNot complied with
Mar 31, 2021Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration dropped sheetrock ceiling in the bathroom located at apt 6e, 6th story, 1st apartment from east at southFirst no access to re- inspect violation
Mar 31, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the 3rd room from north located at apt 6e, 6th story, 1st apartment from east at southFirst no access to re- inspect violation
Mar 31, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the 4th room from north located at apt 6e, 6th story, 1st apartment from east at southFirst no access to re- inspect violation
Mar 31, 2021Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration dumb waiter converted to pantry in the kitchen located at apt 5g, 5th story, 3rd apartment from east at southNot complied with
Mar 03, 2021Section 27-2026 adm code repair the broken or defective connection , leak at water control valve to toilet on west wall in the bathroom located at apt 2b, 2nd story, 2nd apartment from north at eastNot complied with
Aug 13, 2020Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration dumb waiter closet being used as a pantry in the kitchen located at apt apt6d, 6th storyNot complied with
Jun 12, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and walls throughout in the entire apartment located at apt 7b, 7th story, 1st apartment from west at northFirst no access to re- inspect violation
Jun 12, 2020Section 27-2005 adm code properly repair with similar material the broken or defective wood sink base cabinet in the kitchen located at apt 7b, 7th story, 1st apartment from west at northFirst no access to re- inspect violation

Property Owners and Associates

1114 Bushwick Property LLC
Corporate Owner
2.4(3)

2 Properties

54 Units

1202 Avenue K LLC
Corporate Owner
3(3)

2 Properties

85 Units

1236 Pacific LLC
Corporate Owner
3.3(4)

2 Properties

88 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Take forever to respond to any issues and even longer to fix them.
Former Tenant
Pros:
Big apartments, elevator, location.
Cons:
Management, elevator malfunctioning, bugs and (...
Advice to owner:
Be more attentive to residents.
Long Term Tenant
Former Tenant
Pros:
Easy access to transportation; large (c) openig...
Cons:
Management unresponsive. Maintenance requests g...
Advice to owner:
Invest in your tenants, especially those in ren...