582 St Nicholas Avenue,Manhattan, NY 10030

96 Units

Built in 1914

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
394 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 126 violations which is 1.31 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
23Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
57Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
46Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Feb 26, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 4 sq. ft at east wall in the bathroom located at apt 308, 3rd story, 2nd apartment from south at west , section at southNotice of issuance sent to tenant
Feb 26, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation heat riser in the bathroom located at apt 308, 3rd story, 2nd apartment from south at west , section at southNov sent out
Feb 19, 2024§ 27-2005 hmc: properly repair or replace the broken or defective door knob in the entrance located at apt 308, 3rd story, 2nd apartment from south at west , section at southNov sent out
Jan 25, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east, the private hallway located at apt 105, 1st story, 1st apartment from north at eastNov sent out
Dec 20, 2023§ 27-2053 adm code post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st storyNov sent out
Dec 05, 2023§ 27-2005 adm code properly repair with similar material the broken or defective wood wash basin cabinet bottom in the bathroom located at apt 604, 6th story, 1st apartment from east at southCiv14 mailed
Dec 05, 2023§ 27-2005 adm code properly repair with similar material the broken or defective wood sink base cabinet bottom in the kitchen located at apt 604, 6th story, 1st apartment from east at southCiv14 mailed
Sep 22, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from north at east located at apt 516, 5th story, 2nd apartment from west at north , section ''east''Not complied with
Aug 23, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 308, 3rd story, 2nd apartment from east at south , section at westFirst no access to re- inspect violation
Aug 22, 2023§ 27-2005 adm code properly repair with similar material the broken or defective wood subflooring in the kitchen located at apt 218, 2nd story, 1st apartment from west at northNot complied with
Aug 12, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 516, 5th story, 2nd apartment from west at north , section ''north''Not complied with
Aug 02, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 605, 6th story, 1st apartment from north at eastFirst no access to re- inspect violation
Aug 02, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from north at east located at apt 605, 6th story, 1st apartment from north at eastFirst no access to re- inspect violation
Aug 02, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the closet north wall in the foyer located at apt 605, 6th story, 1st apartment from north at eastFirst no access to re- inspect violation
Aug 02, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 605, 6th story, 1st apartment from north at eastFirst no access to re- inspect violation
Aug 02, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 605, 6th story, 1st apartment from north at eastFirst no access to re- inspect violation
Aug 02, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 605, 6th story, 1st apartment from north at eastFirst no access to re- inspect violation
Aug 02, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 605, 6th story, 1st apartment from north at eastFirst no access to re- inspect violation
Mar 02, 2023§ 27-2005 adm code refit upper and lower window sashes at south wall in the 5th room from east located at apt 605, 6th story, 1st apartment from north at eastFirst no access to re- inspect violation
Feb 24, 2023§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 605, 6th story, 1st apartment from north at eastFirst no access to re- inspect violation
Dec 24, 2022§ 27-2005 adm code properly secure the loose wall cabinet at east wall in the kitchen located at apt 308, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Aug 11, 2021§ 27-2011 adm code cleanse to the satisfaction of this department the tiles at all walls at bathtub in the bathroom located at apt 410, 4th story, 3rd apartment from south at west , section ''105 edgeco''First no access to re- inspect violation
Jun 07, 2019§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration metal gate floor to ceiling at public hall, 1st storyNot complied with

Property Owners and Associates

111/113 Fifth LLC & 1229 Halsey LLC
Corporate Owner
2.7(28)

41 Properties

1044 Units

582 St Nicholas Associates, LLC
Corporate Owner
2.8(1)

2 Properties

104 Units

Gilman Management Corp.
Agent
2.6(26)

40 Properties

957 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

It’s a hit or miss
Former Tenant
Pros:
My apartment is the only (c) openigloo thing I ...
Cons:
However, the garbage system in (c) openigloo th...
Advice to owner:
Please get the garbage system better and keep t...