640 West 153 Street,Manhattan, NY 10031

94 Units

Built in 1910

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
126 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 41 violations which is 0.43 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
6Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
21Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
14Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 08, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation at heat riser pipe in the kitchen located at apt aptd4, 4th story, 1st apartment from east at south , section at eastNov sent out
Nov 01, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the bathroom located at apt d2, 5th story, 9th apartment from west at northCiv14 mailed
Nov 01, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... (approximately 5 sq.ft) at the ceiling ceiling in the 1st room from north at west located at apt d2, 5th story, 9th apartment from west at northCiv14 mailed
Nov 01, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... (approximately 6 sq.ft) at the sill of the 1st window frame from west at north wall in the 1st room from north at west located at apt d2, 5th story, 9th apartment from west at northCiv14 mailed
Nov 01, 2023§ 27-2005 hmc: properly repair or replace the broken or defective light switch in the bathroom located at apt d2, 5th story, 9th apartment from west at northCiv14 mailed
Aug 27, 2021Section 27-2026 adm code repair the leaky and/or defective faucets at wash basin in the bathroom located at apt c8, 3rd story, 4th apartment from east at southFalse certification

Property Owners and Associates

1221 Realty LLC
Owner, Corporate Owner, Agent
3.3(3)

4 Properties

339 Units

2070 LLC
Owner, Corporate Owner, Agent
4.2(1)

2 Properties

184 Units

225 LLC
Owner, Corporate Owner, Agent
2.9(3)

2 Properties

190 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Previous Theft Problem - Different Living Culture in a Populated City
Former Tenant
Pros:
-Very friendly and responsive owner -Despite (...
Cons:
-I airbnbed here for a (c) openigloo private ro...
Advice to owner:
I understand that the neighborhood and building...