570 West 204 Street,Manhattan, NY 10034

89 Units

Built in 1925

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
617 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 105 violations which is 1.17 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
20Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
58Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
27Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Feb 14, 2024§ 27-2005 hmc: refit upper and lower sash, counter balance at window in the 1st room from east at north located at apt 3i, 3rd story, 6th apartment from north at eastNov sent out
Feb 14, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 3 sq ft of mold at window sill in the 1st room from east at south located at apt 3i, 3rd story, 6th apartment from north at eastNotice of issuance sent to tenant
Nov 08, 2023§ 27-2005 adm code properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 6j, 6th story, 1st apartment from west at northFirst no access to re- inspect violation
Nov 08, 2023§ 27-2005 adm code replace with new the missing electric light switch cover at west wall in the private hallway located at apt 6j, 6th story, 1st apartment from west at northFirst no access to re- inspect violation
Jun 06, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at west wall in the 3rd room from east located at apt 5c , 5th story, 2nd apartment from west at northNov sent out
Jun 06, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilings throughout in the entire apartment located at apt 5c , 5th story, 2nd apartment from west at northNov sent out
Jun 05, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the south wall in the bathroom located at apt 1g, 1st story, 1st apartment from north at eastFirst no access to re- inspect violation
May 31, 2023§ 27-2005 hmc: refit the door at entrance in the bathroom located at apt 1g, 1st story, 1st apartment from north at eastFirst no access to re- inspect violation
Apr 06, 2023§ 27-2005 adm code properly repair the broken or defective light fixture at the ceiling in the private hallway located at apt 3d, 3rd story, 1st apartment from north at east , section ''north''Not complied with
Oct 11, 2019§ 27-2005 adm code paint metal in accordance with dept. regulation the heat riser in the 1st bathroom from north located at apt 1f, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
May 17, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at west wall, east wall in the kitchen located at apt 6m, 6th story, 3rd apartment from east at southNot complied with
Feb 11, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer , the 1st room from east at south located at apt 6l, 6th story, 2nd apartment from south at westNot complied with
Oct 30, 2018§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wall erected floor to ceiling using wood / studs and sheetrock creating additional room at private hall located at apt 6j, 6th story, 1st apartment from east at southNot complied with
Nov 26, 2016§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tile's in the kitchen located at apt 5h, 5th story, 1st apartment from north at eastFirst no access to re- inspect violation
Nov 26, 2016§ 27-2005 adm code properly repair with similar material the broken or defective interior wooden door casing in the entrance located at apt 5h, 5th story, 1st apartment from north at eastFirst no access to re- inspect violation
Nov 23, 2016Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the kitchen located at apt 4f, 4th story, 2nd apartment from west at northNot complied with
Jun 12, 2016§ 27-2005 adm code properly repair with similar material the broken or defective wooden floor and vinyl covering in the kitchen located at apt 6l, 6th story, 2nd apartment from south at westNot complied with
Apr 27, 2016§ 27-2005 adm code properly repair the broken or defective wood floor in the kitchen located at apt 6l, 6th story, 2nd apartment from west at northNot complied with
Sep 09, 2015§ 27-2005 adm code refit door at south in the 1st room from east at north located at apt 3c, 3rd story, 2nd apartment from west at north , section at northNot complied with
Sep 09, 2015§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the bathroom , the 1st room from east at south, the private hallway , the 2nd room from east at south located at apt 3c, 3rd story, 2nd apartment from west at north , section at northNot complied with

Property Owners and Associates

570 W 204th LLC
Corporate Owner
2.9(3)

2 Properties

97 Units

Freddy Espaillat
Site Manager
2.9(3)

1 Property

89 Units

Noah Osnos
Head Officer
3.4(5)

7 Properties

133 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Spacious but lacking in amenities
Former Tenant
Pros:
A lot of space and (c) openigloo privacy.
Cons:
Disrespectful neighbors, unresponsive managemen...
Advice to owner:
Renovate the basement so that all washers and d...
Unresponsive and Unhelpful
Former Tenant
Pros:
Large apartments Essential utilities always run...
Cons:
Water damage and holes in (c) openigloo ceiling...
Advice to owner:
Create a system for reporting issues and accoun...
My honest opinion
Former Tenant
Pros:
When theres a problem that (c) openigloo needs ...
Cons:
Drugs dealers hang out in (c) openigloo the hal...
Advice to owner:
Keep them drugs dealers away from the building !!!