1795 Riverside Drive,Manhattan, NY 10034

70 Units

Built in 1925

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
362 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 90 violations which is 1.28 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
21Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
57Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
12Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Sep 26, 2023§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wall erected from floor to ceiling creating room in the foyer located at apt 3j, 3rd story, 2nd apartment from north at east , section at northNov sent out
Aug 25, 2023§ 27-2027 adm code grade with proper slope to existing drain and pave with 4 inches of concrete the surface in the entire apartment located at apt 2e, 2nd storyFirst no access to re- inspect violation
Dec 07, 2022§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 2e, 2nd story, 3rd apartment from west at northFirst no access to re- inspect violation
Dec 07, 2022§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak ceiling in the foyer located at apt 2e, 2nd story, 3rd apartment from west at northFirst no access to re- inspect violation
Nov 23, 2022§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 2e, 2nd story, 3rd apartment from west at northFirst no access to re- inspect violation
Nov 23, 2022§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 2e, 2nd story, 3rd apartment from west at northFirst no access to re- inspect violation
Aug 24, 2022§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration room created using metal framing , glass and lockable door under public hall stairs. at public hall, 1st storyNot complied with
Apr 12, 2019§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from east at south wall in the kitchen located at apt 3g, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Apr 12, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st closet from east at south wall door frame, 1st closet from east at south wall door, 1st door frame from east at south wall, 1st door from east at south wall in the 1st room from north located at apt 3g, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Apr 12, 2019§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ,, in the bathroom located at apt 3g, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Apr 12, 2019§ 27-2005 adm code refit metal door in the entrance located at apt 3g, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Apr 12, 2019§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st radiator from east at south wall, 1st riser from east at south wall in the 1st room from north located at apt 3g, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Apr 12, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd private hallway from north, the 3rd room from north, the bathroom , the 1st private hallway from north, the foyer located at apt 3g, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Sep 09, 2018§ 27-2005 adm code refit the door in the bathroom located at apt 3g, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Sep 09, 2018§ 27-2005 adm code replace with new the broken or defective upper escutcheon plate at south riser in the bathroom located at apt 3g, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Sep 09, 2018§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the bathroom , the 3rd room from north, the foyer located at apt 3g, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Sep 09, 2018§ 27-2005 adm code refit the door in the entrance located at apt 3g, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Sep 09, 2018§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall, 1st door from east at south wall, 1st closet from east at south wall door frame in the 1st room from north located at apt 3g, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Sep 15, 2017§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the foyer located at apt 3b, 3rd story, 2nd apartment from west at northFirst no access to re- inspect violation
May 23, 2016§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ' in the bathroom located at apt 3g, 3rd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Jun 21, 2015§ 27-2005 adm code paint metal in accordance with dept. regulation the heat riser in the bathroom located at apt 2e, 2nd story, 5th apartment from south at westFirst no access to re- inspect violation

Property Owners and Associates

Eduardo Jimenez
Site Manager
3.4(2)

1 Property

70 Units

Eduardo Jimenez
Officer
3.6(92)

53 Properties

6470 Units

Laurence Gluck
Head Officer
3.3(3)

4 Properties

731 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Management and super are slow
Former Tenant
Pros:
Great building, good shape overall. (c) openigl...
Cons:
Fixes, water and heat. Always (c) openigloo slo...
Advice to owner:
Invest in a message board system for residents
Beautiful and well kept
Former Tenant
Pros:
The building is so well (c) openigloo maintained
Cons:
Some of the units are (c) openigloo re done and...
Advice to owner:
Stop making modern apartments out of pre war be...