2547 7 Avenue,Manhattan, NY 10039

312 Units

Built in 1968

27 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
1000 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 496 violations which is 1.58 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
111Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
319Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
66Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiiling at public hall, 13th storyNov sent out
Apr 02, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 6 sq ft at ceiling in the 3rd room from north located at apt 6i, 13th story, 1st apartment from east at southNotice of issuance sent to tenant
Apr 01, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Mar 25, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling near fire staircase a at public hall, 27th storyNov sent out
Mar 25, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling between apt 27g and apt 27h at public hall, 27th storyNov sent out
Mar 25, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at south wall in compactor closet at public hall, 27th storyNov sent out
Mar 25, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at north end and south end of hall. at public hall, 27th storyNov sent out
Jan 29, 2024§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of acoustic drop ceiling, at public hall, 1st storyNov sent out
Jan 14, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st storyNov sent out
Dec 29, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic tile at west wall in the kitchen located at apt 24e, 24th story, 2nd apartment from east at southNov sent out
Dec 29, 2023§ 27-2026 adm code repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 24e, 24th story, 2nd apartment from east at southNov sent out
Dec 29, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all ceilings and walls in the entire apartment located at apt 24e, 24th story, 2nd apartment from east at southNov sent out
Oct 14, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4j, 4th story, 1st apartment from east at southNov sent out
Aug 19, 2023§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st storyNot complied with
Aug 14, 2023§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st storyNot complied with
Jul 24, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 27th storyNot complied with
Jul 13, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic wall tiles at south wall at compactor closet, 12th storyNot complied with
Jul 13, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls at compactor closet, 12th storyNot complied with
Mar 04, 2023Section 27-2005 adm code properly repair with similar material the broken or defective vinyl tile in the 3rd room from north located at apt 13c, 13th story, 1st apartment from west at northNov sent out
Mar 01, 2023§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant material at ceiling at compactor closet, 13th storyNot complied with
Mar 01, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic tile south wall at compactor closet, 13th storyNot complied with
Mar 01, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at compactor closet, 13th storyNot complied with
Mar 01, 2023Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from north located at apt 13c, 13th story, 1st apartment from west at northNov sent out
Mar 01, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th bathroom from north at east located at apt 13c, 13th story, 1st apartment from west at northNov sent out
Feb 22, 2023Section 27-2005 adm code properly repair with similar material the broken or defective caulking at walls at bathtub in the bathroom located at apt 14d, 13th story, 1st apartment from south at westNov sent out
Feb 07, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls, ceilings and moldings in the entire apartment located at apt 14d, 13th story, 1st apartment from south at westNov sent out
Jan 25, 2023Section 27-2005 adm code refit sliding closet doors at west wall in the 1st room from north located at apt 4g, 4th story, 4th apartment from north at eastNov sent out
Jan 25, 2023Section 27-2005 adm code refit sliding closet doors at west wall in the 2nd room from north located at apt 4g, 4th story, 4th apartment from north at eastNov sent out
Jan 25, 2023Section 27-2005 adm code refit sliding closet doors at north wall in the private hallway located at apt 4g, 4th story, 4th apartment from north at eastNov sent out
Jan 25, 2023Section 27-2005 adm code properly secure the loose faucet at sink in the kitchen located at apt 4g, 4th story, 4th apartment from north at eastNov sent out
Dec 23, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls in the kitchen located at apt 17f, 17th story, 3rd apartment from north at eastNov sent out
Dec 23, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls in the bathroom located at apt 17f, 17th story, 3rd apartment from north at eastNov sent out
Dec 23, 2022Section 27-2026 adm code repair the leaky and/or defective faucets at sink in the kitchen located at apt 17f, 17th story, 3rd apartment from north at eastNov sent out
Nov 15, 2022Section 27-2005 adm code properly repair with similar material the broken or defective grout at ceramic tiles at north, south, east and west walls in the bathroom located at apt 24e, 24th story, 2nd apartment from north at eastNov sent out
Nov 15, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling, north, west and south walls in the bathroom located at apt 24e, 24th story, 2nd apartment from north at eastNov sent out
Nov 15, 2022Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 24e, 24th story, 2nd apartment from north at eastNov sent out
Nov 15, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the 5th room from north located at apt 24e, 24th story, 2nd apartment from north at eastNov sent out
Nov 15, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling, north and south walls in the kitchen located at apt 24e, 24th story, 2nd apartment from north at eastNov sent out
Nov 15, 2022Section 27-2026 adm code repair the leaky and/or defective faucets at sink in the bathroom located at apt 5h, 5th story, 5th apartment from north at eastNov sent out
Nov 07, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at north and south walls in the 1st room from north at west located at apt 19c, 19th story, 1st apartment from west at northNov sent out
Nov 04, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the kitchen , the 2nd private hallway from north, the 1st private hallway from north, the 2nd bathroom from north, the 3rd room from north, the 1st room from north at west, the 1st room from north at east, the 1st bathroom from north located at apt 9c, 9th story, 1st apartment from west at northNov sent out
Sep 21, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 27th storyNot complied with
Sep 21, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls at compactor closet, 27th storyNot complied with
Sep 14, 2022§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at lobby, 1st storyNot complied with
Sep 14, 2022§ 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at lobby, 1st storyNot complied with
Sep 14, 2022§ 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby, 1st storyNot complied with
Sep 14, 2022§ 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.Not complied with
Sep 14, 2022§ 27-2098 adm code file with this department a registration statement for building.Violation will be reinspected
Sep 14, 2022§ 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at lobby, 1st storyNot complied with
Sep 14, 2022§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at lobby, 1st storyNot complied with
Aug 03, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 27th storyFirst no access to re- inspect violation
Jul 30, 2022Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency's housing information guide. a sample notice can be found at www.nyc.gov/hpd.First no access to re- inspect violation
Jul 30, 2022Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedFirst no access to re- inspect violation
Jul 30, 2022Section 27-2005 adm code refit door to east stairs ''a'' at public hall, 1st storyFirst no access to re- inspect violation
Jul 30, 2022Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st storyFirst no access to re- inspect violation
Jul 30, 2022Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st storyFirst no access to re- inspect violation
Jul 30, 2022Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyFirst no access to re- inspect violation
Jul 30, 2022Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.First no access to re- inspect violation
Jul 30, 2022Section 27-2005 adm code refit chute at compactor closet at public hall, 4th storyFirst no access to re- inspect violation
Jun 22, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the 1st closet from north at east wall wall in the 1st room from north at west located at apt 27c, 27th story, 1st apartment from west at northNov certified late
Jun 22, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 3rd room from north located at apt 27c, 27th story, 1st apartment from west at northNov certified late
May 27, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls in the 3rd room from north located at apt 24e, 24th story, 2nd apartment from north at eastCiv14 mailed
May 12, 2022§ 27-2005 adm code properly repair with similar material the broken or defective ceramic wall tiles in the kitchen located at apt 8j, 8th story, 1st apartment from south at westFirst no access to re- inspect violation
Apr 28, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from north located at apt 27f, 27th story, 3rd apartment from north at eastNov sent out
Apr 19, 2022Section 27-2005 adm code refit door in the entrance located at apt 20g, 20th story, 4th apartment from north at eastNov sent out
Mar 20, 2022Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 14d, 14th story, 1st apartment from north at eastNov sent out
Mar 20, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the foyer , the private hallway , the 1st room from north at east, the bathroom located at apt 14d, 14th story, 1st apartment from north at eastNov sent out
Mar 07, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling, in the entire apartment located at apt 24e, 24th story, 2nd apartment from east at southNov sent out
Mar 03, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and all walls in the entire apartment located at apt 24e, 24th story, 2nd apartment from north at eastNov sent out
Feb 25, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and east wall in the bathroom located at apt 17f, 17th story, 3rd apartment from north at eastNov sent out
Feb 22, 2022§ 27-2005 adm code properly repair the broken or defective door bell, in the entrance located at apt 8c, 8th story, 1st apartment from south at westFirst no access to re- inspect violation
Feb 22, 2022§ 27-2005 adm code properly repair the broken or defective door, in the 4th room from north at west located at apt 8c, 8th story, 1st apartment from south at westFirst no access to re- inspect violation
Feb 18, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 27th storyFirst no access to re- inspect violation
Feb 15, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 27th storyFirst no access to re- inspect violation
Feb 14, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and all walls in the entire apartment located at apt 24e, 24th story, 2nd apartment from north at eastNov sent out
Feb 14, 2022Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling at laundry room, 1st storyFirst no access to re- inspect violation
Feb 13, 2022Section 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles at north wall in the 3rd bathroom from north located at apt 3i, 3rd story, 1st apartment from east at southNov sent out
Jan 27, 2022Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 24e, 24th story, 2nd apartment from south at westNov sent out
Jan 27, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceilings and walls through-out in the entire apartment located at apt 24e, 24th story, 2nd apartment from south at westNov sent out
Jan 18, 2022Section 27-2005 adm code refit the door to apartment in the entrance located at apt 27f, 27th story, 3rd apartment from north at eastNov sent out
Jan 03, 2022Section 27-2005 adm code properly repair with similar material the broken or defective buckled wood floor in the private hallway located at apt 27f, 27th story, 3rd apartment from east at southNov sent out
Dec 27, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north at east, the 2nd private hallway from north, the 2nd bathroom from north located at apt 2i, 2nd story, 1st apartment from east at southNov sent out
Dec 23, 2021Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st storyNov sent out
Dec 20, 2021Section 27-2005 adm code & 309 m/d law abate the nuisance consisting of exposed waterline pipe causing moisture at ceiling in the private hallway located at apt 27f, 27th story, 3rd apartment from north at eastNov sent out
Nov 05, 2021Section 27-2005 adm code properly repair the broken or defective mechanical air vent at west wall in the bathroom located at apt 17f, 17th story, 3rd apartment from south at westNov sent out
Oct 02, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at south wall, north wall and ceiling in the 1st room from north at west located at apt 8c, 8th story, 1st apartment from west at northViolation will be reinspected
Sep 25, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling. in the entire apartment located at apt 17f, 17th story, 3rd apartment from north at eastNov sent out
Sep 11, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 26d, 26th story, 1st apartment from east at southNov sent out
Jun 16, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 22f, 22nd story, 2nd apartment from north at eastNov certified late
Jun 14, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ... ceiling at public hall, 1st storyNot complied with
Jun 01, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north, the 1st room from north at west, the 1st room from north at east, the foyer , the bathroom located at apt 14d, 14th story, 1st apartment from north at eastNov certified late
Apr 18, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and north wall at compactor closet, 27th storyNot complied with
Nov 02, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling at compactor closet at public hall, 27th storyNot complied with
Aug 31, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and north wall at compactor closet, 27th storyNot complied with
Sep 20, 2019§ 27-2026 adm code repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 8j, 8th story, 1st apartment from south at westViolation will be reinspected
Sep 05, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls throughout in the entire apartment located at apt 12k, 12th story, 2nd apartment from south at westViolation will be reinspected
Nov 28, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department east, south and west walls and ceiling in the 4th room from north located at apt 24e, 24th story, 2nd apartment from north at eastNov sent out
Nov 28, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the 2nd room from north located at apt 24e, 24th story, 2nd apartment from north at eastNov sent out
Nov 28, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 24e, 24th storyNov sent out
Nov 28, 2018Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 24e, 24th story, 2nd apartment from north at eastNov sent out
Nov 19, 2018Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in wall hung cabinet in the kitchen located at apt 17f, 17th story, 3rd apartment from north at eastNov sent out
Nov 19, 2018Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchen located at apt 17f, 17th story, 3rd apartment from north at eastNov sent out
Nov 19, 2018Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 17f, 17th story, 3rd apartment from north at eastNov sent out
Apr 23, 2018Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl , in the bathroom located at apt 24e, 24th story, 3rd apartment from south at westNov sent out
Aug 30, 2017§ 27-2026 adm code repair the leaky and/or defective faucets at the washbasin in the bathroom located at apt 8j, 8th story, 1st apartment from south at westViolation will be reinspected
Aug 30, 2017§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 12k, 12th story, 2nd apartment from south at westViolation will be reinspected
Feb 26, 2015Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceilings in the entire apartment located at apt 3i, 3rd story, apartment at southNot complied with
Feb 18, 2015Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at the ceiling at north bathroom located at apt 19c, 19th story, 1st apartment from west at northFirst no access to re- inspect violation
Feb 18, 2015Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the north bathroom located at apt 19c, 19th story, 1st apartment from west at northFirst no access to re- inspect violation
Aug 15, 2014Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 1st terrace from east located at apt 14d, 14th story, 1st apartment from north at eastNot complied with
Oct 25, 2013Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st terrace from east located at apt 14d, 14th story, 1st apartment from north at eastNot complied with

Property Owners and Associates

Esplanade Gardens Inc
Corporate Owner
3(3)

4 Properties

1242 Units

Esplanade Gardens Inc.
Site Manager, Officer
3.1(4)

6 Properties

1866 Units

Metro Management Development Inc
Agent
3.6(11)

81 Properties

6628 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet