750 Grand Concourse,Bronx, NY 10451

101 Units

Built in 1937

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
1000 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 65 violations which is 0.64 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
7Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
29Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
29Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 05, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling ( approx 1 sqft) in the private hallway located at cellar apt aj, 1st cellar apt from north at eastNotice of issuance sent to tenant
Mar 24, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at south located at apt 5c, 5th story, 1st apartment from south at west , section at northCiv14 mailed
Mar 24, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation at 1st radiator from south at west wall in the 3rd room from east at north located at apt 5c, 5th story, 1st apartment from south at west , section at northCiv14 mailed
Mar 21, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 5j, 5th story, 2nd apartment from north at east , section ''south''Nov sent out
Dec 27, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 4 sq ft at east wall 1st closet from west at north wall wall in the foyer located at apt 5f, 5th story, 4th apartment from south at westCiv14 mailed
Jun 24, 2022§ 27-2026 adm code repair the broken or defective connection at waste line under sink in the kitchen located at apt aj, 6th apartment from west at north , section ''a''Not complied with
Nov 26, 2021§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt ajViolation will be reinspected

Property Owners and Associates

Ved Parkash
Site Manager, Owner, Agent
2.6(7)

13 Properties

765 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Run for your life
Former Tenant
Pros:
Building is across from a (c) openigloo nice pa...
Cons:
The boiler needs to be (c) openigloo fixed seve...
Advice to owner:
Sell the property to someone who cares enough t...
i few things
Former Tenant
Pros:
close to a park
Cons:
super takes too long to (c) openigloo fix things