Apr 10, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all ceilings and walls in the entire apartment located at apt 2c, 2nd story, 2nd apartment from east at south , 1st section from north at eastNov sent out
Nov 11, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation at riser pipe in the kitchen located at apt 1r, 1st story, 6th apartment from west at northNov sent out
Nov 03, 2023§ 27-2026 adm code repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 1r, 1st story, 6th apartment from north at eastNov sent out
Nov 03, 2023§ 27-2026 adm code repair the leaky and/or defective faucets at sink in the kitchen located at apt 1r, 1st story, 6th apartment from north at eastNov sent out
Sep 24, 2022§ 27-2026 adm code repair the leaky and/or defective faucets at sink in the kitchen located at apt 4a, 4th story, 1st apartment from north at eastNov sent out
Sep 15, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north, the kitchen located at apt 5j, 5th story, 1st apartment from south at westNov sent out
Mar 20, 2020§ 27-2005 adm code properly repair the broken or defective paving concrete floor at yard, section at northNot complied with
Sep 13, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the bulkhead ceiling at public hall, 6th storyNot complied with
Sep 05, 2019§ 27-2005 adm code properly repair with similar material the broken or defective ceiling with fire retardant materials at 6th story bulkhead leading to the roof.Not complied with
Sep 05, 2019§ 27-2005 adm code properly repair the broken or defective paving at the south court yardNot complied with
Sep 04, 2019§ 27-2005 adm code paint metal in accordance with dept. regulation the door and trim in the entrance located at apt 6b, 6th story, 1st apartment from east at southNot complied with
Sep 04, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all doors and trims in the entire apartment located at apt 6b, 6th story, 1st apartment from east at southNot complied with
Aug 31, 2019§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, and walls. in the entire apartment located at apt 5r, 5th story, 1st apartment from west at north , section at eastNot complied with
Aug 07, 2018§ 27-2005 adm code refit the door in the entrance located at apt 5o, 5th story, 4th apartment from south at westFirst no access to re- inspect violation
Aug 01, 2016§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the kitchen , the 1st bathroom from north at west, the 1st bathroom from north at east, the 3rd room from north at west, the 3rd room from north at east, the 2nd room from north, the 1st room from north at west, the 1st room from north at east, the foyer located at apt 6b, 6th story, 1st apartment from east at southNot complied with
Jul 17, 2016§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the foyer , the 2nd bathroom , the 1st bathroom , the kitchen , the 1st room from east at center, the 1st room from east at south, the 1st room from east at north located at apt 6b, 6th story, 1st apartment from east at southNot complied with
Apr 30, 2015§ 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.Not complied with
Dec 28, 2014§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls, window frames, door frames, baseboards and ceilings. in the entire apartment located at apt 6b, 6th story, 1st apartment from east at southNot complied with
Jun 26, 2013§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at east, the 2nd room from north, the kitchen , the 3rd room from north at west, the 1st room from north at east located at apt 6b, 6th story, 1st apartment from east at southNot complied with