Dec 18, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 6 sq. ft. at the ceiling in the bathroom located at apt 1c, 1st story, 1st apartment from south at westCiv14 mailed
Jul 06, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall, south wall in the 4th bathroom from east at south located at apt 5d, 5th story, 2nd apartment from south at westNov sent out
Mar 09, 2023Section 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze of the bathtub in the 3rd bathroom from east at north located at apt 5d, 5th storyNov sent out
Aug 06, 2022Section 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the 1st bathroom from east located at apt 6a, 6th story, 1st apartment from north at eastNov sent out
Aug 06, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 6a, 6th story, 1st apartment from north at eastNov sent out
Dec 04, 2021Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at 2nd window frame from west at north wall in the kitchen located at apt 5d, 5th story, 2nd apartment from south at westNov sent out
Dec 04, 2021Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at 1st window frame from west at north wall in the 2nd room from east located at apt 5d, 5th story, 2nd apartment from south at westNov sent out
Dec 04, 2021Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak the 1st window frame from west at north wall in the 3rd room from east at north located at apt 5d, 5th story, 2nd apartment from south at westNov sent out
Dec 04, 2021Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 5th room from east at north located at apt 5d, 5th story, 2nd apartment from south at westNov sent out
Dec 04, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the north wall, south wall, ceiling in the 2nd bathroom located at apt 5d, 5th story, 2nd apartment from south at westNov sent out
Dec 04, 2021Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom located at apt 5d, 5th story, 2nd apartment from south at westNov sent out
Dec 04, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 2nd room from east, the 5th room from east at south, the 5th room from east at north, the 2nd bathroom , the 1st bathroom , the 3rd room from east at north located at apt 5d, 5th story, 2nd apartment from south at westNov sent out