1453 Walton Avenue,Bronx, NY 10452

73 Units

Built in 1927

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
199 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 73 violations which is 1 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
25Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
24Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
24Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Mar 01, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west , section at southNov sent out
Mar 01, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at east wall, west wall, and at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from south at west , section at southNov sent out
Mar 01, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 1, 1st story, 1st apartment from south at west , section at southNov sent out
Mar 01, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the kitchen , the kitchen , the 1st room from east at south located at apt 1, 1st story, 1st apartment from south at west , section at southNov sent out
Jan 08, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th story, section ''1455''Nov sent out
Dec 10, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 1, 1st story, 1st apartment from south at westNov certified on time
Nov 28, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 4th room from east at south located at apt 1, 1st story, 1st apartment from south at westNov certified on time
Nov 28, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east at south located at apt 1, 1st story, 1st apartment from south at westNov certified on time
Feb 20, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east and south walls inside 1st closet from east at north wall near bathroom in the private hallway located at apt 2l, 2nd story, 2nd apartment from north at eastNot complied with
Feb 20, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south and west walls in the 1st room from north at center located at apt 2l, 2nd story, 2nd apartment from north at eastNot complied with
Feb 20, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the cracks at ceiling, and all walls inside 2nd closet from east at north wall near bathroom in the private hallway located at apt 2l, 2nd story, 2nd apartment from north at eastNot complied with
Feb 20, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at south east walls in the 1st room from north at east located at apt 2l, 2nd story, 2nd apartment from north at eastNot complied with
Sep 10, 2021Section 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder on first stack from north at east at fire escapeInvalid certification
Sep 10, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all wall at public hall, 6th story, section ''1455''Invalid certification
Sep 10, 2021Section 27-2010, 2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at public hall, 3rd story, section ''1455''Invalid certification
Sep 10, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling at intermediate landing at public hall stairs, 3rd story, section ''1455''Invalid certification
Aug 30, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling at public hall, 6th story, section at southNov sent out
Aug 27, 2021Section 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at building frontNov sent out
Aug 27, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and south wall at public hall stairs, section at northNov sent out
Aug 27, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the 2nd room from east at south, the foyer , the private hallway , the 1st room from east at south located at apt 4l, 4th story, 2nd apartment from north at eastNov sent out
Apr 08, 2021Section 27-2005 adm code refit the apt. door in the entrance located at apt 5d, 5th story, 1st apartment from south at west , section at southNov certified late
May 08, 2019Section 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at 3rd fire escape from south at westNot complied with
Dec 05, 2016Section 27-2005 adm code replace with new the missing tub drain stopper in the bathroom located at apt 1a, 1st story, 1st apartment from north at eastNot complied with
Mar 17, 2016Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east , section ''south''Not complied with
Apr 14, 2013Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partition erected from floor to ceiling sub-dividing the room in the 2nd room from north located at apt 4c, 4th story, 1st apartment from east at south , section at southFirst no access to re- inspect violation

Property Owners and Associates

1453 Holding LLC
Corporate Owner
2.3(1)

2 Properties

109 Units

1691 Realty LLC
Corporate Owner
2.6(14)

37 Properties

1789 Units

Edwin Castillo
Site Manager, Agent
2.3(1)

1 Property

73 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Management doesn't care
Former Tenant
Pros:
Rent-stabilized building in a decent, (c) openi...
Cons:
Roaches everywhere, repairs take forever, (c) o...
Advice to owner:
Sell it to someone who actually cares.