Apr 11, 2024§ 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNov sent out
Apr 10, 2024§ 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st storyNov sent out
Apr 05, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 1 sq. ft. at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from north at eastNotice of issuance sent to tenant
Apr 05, 2024§ 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNov sent out
Apr 05, 2024§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder and securing by using nuts and bolts at the south exterior wall stack in front of building at fire escapeNov sent out
Feb 07, 2024§ 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov certified on time
Feb 07, 2024§ 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing sign at public hall, 1st storyNov certified on time
Feb 07, 2024§ 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.Nov certified on time
Feb 07, 2024§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov certified on time