Mar 06, 2024§ 27-2005 hmc: refit window sashes upper and lower at east wall in the 1st room from east at south located at apt 6h, 6th story, 1st apartment from north at eastCiv14 mailed
Mar 06, 2024§ 27-2005 adm code properly secure the loose washbasin in the bathroom located at apt 6h, 6th story, 1st apartment from north at eastCiv14 mailed
Mar 06, 2024§ 27-2005 adm code properly repair with similar material the broken or defective bathtub or reglaze porcelain eenamel finish in the bathroom located at apt 6h, 6th story, 1st apartment from north at eastNov sent out
Mar 06, 2024§ 27-2026 adm code repair the leaky and/or defective faucets at sink in the kitchen located at apt 6h, 6th story, 1st apartment from north at eastCiv14 mailed
Mar 06, 2024§ 27-2026 adm code repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 6h, 6th story, 1st apartment from north at eastCiv14 mailed
Mar 06, 2024§ 27-2005 adm code properly repair with similar material the broken or defective wood floor ( walking area) in the kitchen located at apt 6h, 6th story, 1st apartment from north at eastCiv14 mailed
Mar 06, 2024§ 27-2005 hmc: properly repair or replace the broken or defective spring counter balances at lower window sashe at north walll in the 2nd room from east at south located at apt 6h, 6th story, 1st apartment from north at eastCiv14 mailed
Mar 06, 2024§ 27-2005 adm code properly repair with similar material the broken or defective grout around bathtub and ceramic tiles at north and east walls in the bathroom located at apt 6h, 6th story, 1st apartment from north at eastCiv14 mailed
Mar 06, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation the steam riser in the bathroom located at apt 6h, 6th story, 1st apartment from north at eastCiv14 mailed
Aug 17, 2022Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of sheet rock wall errected from floor to ceiling in the 2nd room from north located at apt 4f, 4th story, 1st apartment from south at westNot complied with
Aug 15, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 3rd room from east located at apt 1g, 1st story, 1st apartment from west at northFirst no access to re- inspect violation