3433 Gates Place,Bronx, NY 10467

50 Units

Built in 1926

5 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
185 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 202 violations which is 4.04 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
21Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
73Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
107Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Apr 02, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.First no access to re- inspect violation
Feb 28, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation heat riser pipe in the bathroom located at apt 53, 5th story, 1st apartment from west at north , section ''north''First no access to re- inspect violation
Feb 28, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall stairs, 5th story, section ''south''Not complied with
Jan 17, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... 5 sq ft at cieling in the bathroom located at apt 28, 2nd story, 1st apartment from west at northDefect letter issued
Jan 17, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... 5 sq ft at north wall in the bathroom located at apt 42, 4th story, 1st apartment from north at eastNot complied with
Jan 17, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and all walls at public hall, 5th story, section at northNot complied with
Jan 09, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at west ,south walls and window frame approx 6 sq.ft in the bathroom located at apt 26, 2nd story, 1st apartment from south at west , section ''3433''First no access to re- inspect violation
Jan 09, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling and north wall approx 6 sq.ft in the bathroom located at apt 36, 3rd story, 1st apartment from south at west , section ''3433''First no access to re- inspect violation
Dec 28, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 6 sq ft around window casing at east wall in the 5th room from north located at apt 57, 5th story, 3rd apartment from west at northFirst no access to re- inspect violation
Dec 28, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 6 sq ft around window casing at east wall in the 3rd room from north located at apt 57, 5th story, 3rd apartment from west at northFirst no access to re- inspect violation
Mar 17, 2023(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.First no access to re- inspect violation
Sep 16, 2022§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt 45, 5th story, 2nd apartment from north at east , section ''3435'', at northNot complied with
Sep 16, 2022§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall, east wall, south wall, west wall in the bathroom located at apt 45, 5th story, 2nd apartment from north at east , section ''3435'', at northNot complied with
Feb 17, 2022(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.First no access to re- inspect violation
Oct 08, 2021§ 27-2005 adm code replace with new the broken or defective metal base cabinet (rusted) at sink in the kitchen located at apt 53, 5th story, 1st apartment from west at north , section ''3435''First no access to re- inspect violation
Oct 08, 2021§ 27-2005 adm code refit doors at base cabinet at west wall in the kitchen located at apt 53, 5th story, 1st apartment from west at north , section ''3435''First no access to re- inspect violation
Oct 08, 2021§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroom located at apt 53, 5th story, 1st apartment from west at north , section ''3435''First no access to re- inspect violation
Jul 15, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer , the 2nd room from east at north, the 3rd room from east located at bsmt-apt e, 2nd bsmt-apt from east at southFirst no access to re- inspect violation
Apr 02, 2021(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.First no access to re- inspect violation
Dec 06, 2020§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from east at north, the kitchen , the foyer , the 1st room from east at south located at apt 59, 5th story, 1st apartment from north at east , section ''3435''First no access to re- inspect violation
May 07, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the private hallway , the kitchen , the 3rd room from north at west, the 3rd room from north at east located at apt 32, 3rd story, 1st apartment from east at south , section ''south''Not complied with

Property Owners and Associates

Adsvf LLC
Agent, Corporate Owner
2(1)

2 Properties

83 Units

Fazli Kukaj
Officer
2(1)

2 Properties

83 Units

Mh Creston LLC
Agent, Corporate Owner
2.6(2)

7 Properties

307 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Needs a lot of work
Former Tenant
Pros:
Nice neighborhood Quick response from the (c) o...
Cons:
Owner sometimes doesn’t cash rent (c) openigloo...
Advice to owner:
Do your job