1990 Ellis Avenue,Bronx, NY 10472

82 Units

Built in 1929

6 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
258 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 74 violations which is 0.9 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
14Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
33Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
27Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 01, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south , section ''center''Nov sent out
Apr 01, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer , the private hallway , the 3rd room from north at west, the 3rd room from north at east located at apt 5a, 5th story, 2nd apartment from east at south , section ''center''Nov sent out
Apr 01, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from south at west wall in the kitchen located at apt 5a, 5th story, 2nd apartment from east at south , section ''center''Nov sent out
Jan 08, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 6k, 6th story, 2nd apartment from west at north , 1st section from north at eastCiv14 mailed
Dec 27, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling and north wall approximately 1sqft in the bathroom located at apt 2k, 2nd story, 1st apartment from west at north , section ''east''Notice of issuance sent to tenant
Dec 21, 2023§ 27-2005 hmc: properly repair or replace the broken or defective rubber gasket of upper and lower refriderator door in the kitchen located at apt 5j, 5th story, 2nd apartment from west at north , 2nd section from north at eastCiv14 mailed
Nov 28, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east, the 1st room from east, the kitchen located at apartment 3h, 3rd story, 1st apartment from west at north , section ''center''Civ14 mailed
Nov 28, 2023§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the 4th room from east located at apt 3h, 3rd story, 1st apartment from west at north , section ''center''Civ14 mailed
Nov 28, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3h, 3rd story, 1st apartment from west at north , section ''center''Civ14 mailed
Nov 28, 2023§ 27-2005 hmc: properly repair or replace the broken or defective electric outlet at east wall in the foyer located at apt 3h, 3rd story, 1st apartment from west at north , section ''center''Civ14 mailed
Nov 28, 2023§ 27-2026 adm code repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3h, 3rd story, 1st apartment from west at north , section ''center''Civ14 mailed
Nov 28, 2023§ 27-2005 adm code properly repair with similar material the broken or defective porcelain finish at bathtub in the bathroom located at apt 3h, 3rd story, 1st apartment from west at north , section ''center''Civ14 mailed
Jan 08, 2020Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at east wall in the bathroom located at apt 2g, 2nd story, 2nd apartment from west at north , section at westNov sent out
Jan 08, 2020Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 2g, 2nd story, 2nd apartment from west at north , section at westNov sent out

Property Owners and Associates

1990 Ellis Ave Corp
Corporate Owner
0(0)

2 Properties

82 Units

Beverly Lobell
Officer, Head Officer
2.3(1)

3 Properties

161 Units

Manny Hinjosa
Site Manager
0(0)

2 Properties

82 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet