2010 Powell Avenue,Bronx, NY 10472

91 Units

Built in 1929

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
517 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 111 violations which is 1.21 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
30Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
34Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
47Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Mar 27, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 1a, 1st story, 4th apartment from west at northViolation open
Mar 27, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 1a, 1st story, 4th apartment from west at northViolation open
Mar 27, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from north located at apt 1a, 1st story, 4th apartment from west at northViolation open
Mar 27, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the private hallway located at apt 1a, 1st story, 4th apartment from west at northViolation open
Mar 19, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall in the 1st room from north located at apt 1a, 1st story, 4th apartment from west at northCiv14 mailed
Mar 19, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling, north wall, 1st window frame from west at north wall in the 1st room from north at west located at apt 3m, 3rd story, 2nd apartment from south at westCiv14 mailed
Mar 19, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall in the bathroom located at apt 3m, 3rd story, 2nd apartment from south at westCiv14 mailed
Mar 15, 2024§ 27-2005 hmc: properly repair or replace the broken or defective rotted sink base cabinet in the kitchen located at apt 3p, 3rd story, 2nd apartment from west at northNov sent out
Mar 15, 2024§ 27-2005 hmc: properly repair or replace the broken or defective rotted washbasin base cabinet in the bathroom located at apt 3p, 3rd story, 2nd apartment from west at northNov sent out
Mar 15, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3p, 3rd story, 2nd apartment from west at northNov sent out
Mar 15, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3p, 3rd story, 2nd apartment from west at northNov sent out
Mar 15, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 3rd room from east located at apt 3p, 3rd story, 2nd apartment from west at northNov sent out
Mar 15, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchenette , the 1st room from north at east located at apt 1a, 1st story, 4th apartment from west at northCiv14 mailed
Feb 08, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 6 sq ft. at north wall in the bathroom located at apt 3m, 3rd story, 2nd apartment from south at westCiv14 mailed
Feb 08, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 3m, 3rd story, 2nd apartment from south at westCiv14 mailed
Feb 08, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the south wall in the 1st room from north at west located at apt 3m, 3rd story, 2nd apartment from south at westCiv14 mailed
Feb 08, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 3m, 3rd story, 2nd apartment from south at westCiv14 mailed
Feb 07, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall in the bathroom located at apt 1a, 1st story, 4th apartment from west at northCiv14 mailed
Jan 28, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the south wall at 1st public hall bulkhead from east, 6th story, section ''east''Nov certified on time
Jan 27, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all ceilings all walls in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west , section ''west''Civ14 mailed
Jan 16, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation at 1st riser from north at east wall in the bathroom located at apt 1a, 1st story, 4th apartment from west at northCiv14 mailed
Jan 16, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at east located at apt 1a, 1st story, 4th apartment from west at northCiv14 mailed
Jan 16, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 1a, 1st story, 4th apartment from west at northCiv14 mailed
Jan 16, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 1a, 1st story, 4th apartment from west at northCiv14 mailed
Jan 16, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchenette , the 1st room from north at east, the kitchenette located at apt 1a, 1st story, 4th apartment from west at northCiv14 mailed
Jan 16, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north located at apt 1a, 1st story, 4th apartment from west at northCiv14 mailed
Mar 30, 2023Section 27-2005 adm code paint metal in accordance with dept. regulation at 1st radiator from south at west wall in the 1st room from north at east located at apt 1a, 1st story, 4th apartment from west at northNot complied with
Dec 26, 2021Section 27-2026 adm code repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 4n, 4th story, 1st apartment from west at north , section ''west''Not complied with
May 07, 2021Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak the ceiling in the 1st room from east at north located at apt 3d, 3rd story, 2nd apartment from west at northNot complied with
May 07, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the private hallway located at apt 3d, 3rd story, 2nd apartment from west at northNot complied with

Property Owners and Associates

2010 Powell LLC
Agent, Corporate Owner
3.3(1)

2 Properties

161 Units

Joseph Fessel
Site Manager, Head Officer
2.3(3)

12 Properties

398 Units

Mdrj, LLC
Agent, Corporate Owner
2.8(57)

49 Properties

1444 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

My perspective living here
Former Tenant
Pros:
The super and his crew (c) openigloo work real ...
Cons:
I've been stuck in the (c) openigloo elevator m...
Advice to owner:
Can you please upgrade the elevator for the saf...