752 Pelham Parkway South,Bronx, NY 10462

139 Units

Built in 1928

6 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
223 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 130 violations which is 0.93 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
15Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
67Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
48Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Feb 13, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 3 square feet at ceiling in the 3rd room from north located at apt 6v, 6th story, 1st apartment from north at eastNotice of issuance sent to tenant
Feb 05, 2024§ 27-2005 adm code properly secure the loose base cabinet counter top in the kitchen located at apt 2d, 2nd story, 1st apartment from west at northNov certified on time
Feb 05, 2024§ 27-2005 hmc: properly repair or replace the broken or defective closet light fixture in the 1st room from north at east located at apt 2d, 2nd story, 1st apartment from west at northCiv14 mailed
Jan 07, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ...at ceiling in the 3rd room from north at west located at apt 5s, 5th story, 1st apartment from west at northCiv14 mailed
Dec 30, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 4sqft at window casing in the 1st room from east located at apt 6v, 6th story, 1st apartment from north at eastNotice of issuance sent to tenant
Aug 15, 2022Section 27-2005 adm code properly repair the broken or defective circuit breaker control panel at west wall in the entire apartment located at apt 4c, 4th story, 1st apartment from east at southNov sent out
May 31, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at south wall in the bathroom located at apt 6r, 6th story, 1st apartment from south at west , section ''752''Nov sent out
May 24, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and south wall at bulkheadNot complied with
May 12, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the 2nd room from east located at apt 6h, 6th story, 1st apartment from east at south , section ''756''Nov sent out
Jan 31, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and south wall bulkhead, at public hall, 6th story, section ''756''Not complied with
Jan 31, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department south wall, at public hall, 6th story, section ''756''Not complied with
Nov 22, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at west, the 2nd room from north at west, the bathroom , the 1st room from north, the kitchen located at apt 5s, 5th story, 1st apartment from west at north , section ''752''Not complied with
Oct 25, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and west wall in the 1st room from north at west located at apt 6r, 6th story, 1st apartment from south at west , section ''752''Not complied with
Oct 02, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the 1st bathroom from north located at apt 6v, 6th story, 1st apartment from north at east , section ''750''First no access to re- inspect violation
Oct 02, 2018Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 6v, 6th story, 1st apartment from north at east , section ''750''First no access to re- inspect violation

Property Owners and Associates

2206 Realty Corp
Corporate Owner
0(0)

2 Properties

161 Units

All State Real Estate Services
Agent
3(1)

6 Properties

343 Units

Arle Realty Corp.
Officer
2.6(2)

8 Properties

407 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet