5800 Arlington Avenue,Bronx, NY 10471

435 Units

Built in 1961

20 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
81 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 28 violations which is 0.06 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
12Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
13Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
3Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Jul 16, 2022Section 27-2005 adm code properly repair the broken or defective door at upper cabinet in the kitchen located at apt 11t, 11th story, 2nd apartment from south at westFirst no access to re- inspect violation
Sep 24, 2021Section 27-2005 adm code refit the door in the 2nd room from east located at apt 10e, 10th story, 1st apartment from east at southFirst no access to re- inspect violation
Sep 24, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the west wall in the bathroom located at apt 10e, 10th story, 1st apartment from east at southFirst no access to re- inspect violation
Dec 20, 2017Section 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the 1st room from north located at apt 6b, 6th story, 1st apartment from west at northFirst no access to re- inspect violation
Dec 13, 2017Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyFirst no access to re- inspect violation
May 22, 2014Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall near the radiator in the 1st room from north located at apt 15l, 15th story, 1st apartment from north at eastFirst no access to re- inspect violation
May 22, 2014Section 27-2005 hmc:trace and repair the source and abate the nuisance consisting of mold ... at north wall near the radiator in the 1st room from north located at apt 15l, 15th story, 1st apartment from north at eastFirst no access to re- inspect violation
Feb 08, 2014Section 27-2005 adm code refit wood cabinet door at west wall in the kitchen located at apt 9b, 9th story, 1st apartment from north at east , section at eastFirst no access to re- inspect violation
Feb 08, 2014Section 27-2013 adm code paint with light colored paint to the satisfaction of this department both sides of terrace door and frame interior and exterior in the 1st room from east at south located at apt 9b, 9th story, 1st apartment from north at east , section at eastFirst no access to re- inspect violation
Feb 08, 2014Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom from north located at apt 9b, 9th story, 1st apartment from north at east , section at eastFirst no access to re- inspect violation
Feb 08, 2014Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom from east located at apt 9b, 9th story, 1st apartment from north at east , section at eastFirst no access to re- inspect violation
Feb 08, 2014Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the kitchen located at apt 9b, 9th story, 1st apartment from north at east , section at eastFirst no access to re- inspect violation

Property Owners and Associates

Akam Associates, Inc
Agent
3.7(129)

360 Properties

33369 Units

Angel Rodriguez
Head Officer
4.1(3)

4 Properties

1307 Units

Avdi Rexhepi
Site Manager
0(0)

1 Property

435 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet