2813 Barker Avenue,Bronx, NY 10467

88 Units

Built in 1929

5 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
1000 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 129 violations which is 1.46 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
32Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
50Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
47Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 15, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at south located at apt g41, 4th story, 1st apartment from south at west , section ''2821''Nov sent out
Mar 27, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and west wall at public hall, 6th storyNov sent out
Jan 18, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 6 sq ft at ceiling in the kitchen located at apt d1, 1st story, 2nd apartment from east at southNotice of issuance sent to tenant
Jan 18, 2024§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of wall erected from floor to ceiling ereating additional room in the 3rd room from north located at apt d1, 1st story, 2nd apartment from east at southNov sent out
Jan 18, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all the walls at 1st public hall bulkhead from east, 5th storySecond no access to re-inspect violation
Dec 18, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the south wall in the 1st room from east located at apt g52, 5th story, 1st apartment from west at northNov sent out
Dec 07, 2023§ 27-2005 adm code properly repair with similar material the broken or defective porcelain glaze finish at bathtub in the bathroom located at apt h52, 5th story, 1st apartment from south at westNov sent out
Dec 07, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling, south wall, west wall in the bathroom located at apt h52, 5th story, 1st apartment from south at westNov sent out
Dec 07, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 2nd room from east at north located at apt h52, 5th story, 1st apartment from south at westNov sent out
Dec 07, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation at baseboard at north wall, 1st door from north at east wall in the foyer located at apt h52, 5th story, 1st apartment from south at westNov sent out
Dec 07, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at baseboard at north wall in the foyer located at apt h52, 5th story, 1st apartment from south at westNov sent out
Dec 07, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at north wall in the 1st room from east at north located at apt h52, 5th story, 1st apartment from south at westNov sent out
Dec 07, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at north wall in the private hallway located at apt h52, 5th story, 1st apartment from south at westNov sent out
Nov 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from east located at apt g52, 5th story, 1st apartment from west at northNov sent out
Nov 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchenette located at apt g52, 5th story, 1st apartment from west at northNov sent out
Nov 05, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt k22, 3rd story, 1st apartment from north at eastNot complied with
Nov 03, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall and the south wall at public hall, 4th story, section ''j2819''Second no access to re-inspect violation
Nov 03, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall and north wall at public hall, 3rd story, section ''j2819''Second no access to re-inspect violation
Nov 03, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall and the west wall at the intermediate landing at public hall stairs, 4th story, section ''j2819''Second no access to re-inspect violation
Nov 03, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls at 1st public hall bulkhead from east, 5th story, section ''j2819''Second no access to re-inspect violation
Nov 03, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls at 1st public hall from north, 5th story, section ''j2819''Second no access to re-inspect violation
Jun 07, 2023§ 27-2005 adm code properly repair with similar material the broken or defective caulking (moldy) at window sill at east wall in the bathroom located at apt h51, 5th story, 1st apartment from east at south , section ''2823''First no access to re- inspect violation
Jun 07, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the north and west wall at the intermediate landing at public hall stairs, 4th storySecond no access to re-inspect violation
Jun 07, 2023§ 27-2005 hmc: properly repair or replace the broken or defective glass (1 pane) at upper sash of window at north wall (inadequate visibility) in the 1st room from north located at apt h51, 5th story, 1st apartment from east at south , section ''2823''First no access to re- inspect violation
Jun 07, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department header at window (damp spot) in the bathroom located at apt h51, 5th story, 1st apartment from east at south , section ''2823''First no access to re- inspect violation
Jun 07, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls at 1st public hall bulkhead from north, 5th storySecond no access to re-inspect violation
Jun 01, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and all walls at 1st public hall bulkhead from eastSecond no access to re-inspect violation
Jun 01, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at east and south walls at 1st public hall, 4th storySecond no access to re-inspect violation
Oct 06, 2021§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt d1, 1st story, 2nd apartment from east at south , section ''2815''Not complied with
Sep 07, 2021§ 27-2005 adm code properly repair with similar material the broken or defective vinyl tiles at floor in the bathroom located at apt d53, 5th story, 1st apartment from east at southFirst no access to re- inspect violation
Sep 07, 2021§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt d53, 5th story, 1st apartment from east at southFirst no access to re- inspect violation
Sep 07, 2021§ 27-2026 adm code repair the leaky and/or defective faucets at wash basin in the bathroom located at apt d53, 5th story, 1st apartment from east at southFirst no access to re- inspect violation

Property Owners and Associates

161-171 Morningside LLC
Corporate Owner
2.6(52)

43 Properties

1549 Units

Bpe Realty Owner LLC
Corporate Owner
2.8(5)

11 Properties

705 Units

Bpe Realty Owner Llc/bpe Ii LLC
Corporate Owner
2.6(3)

7 Properties

366 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Things to change
Former Tenant
Pros:
Very big and spacious and (c) openigloo looks l...
Cons:
Too many rats and a (c) openigloo lot of noise ...