361 East 161 Street,Bronx, NY 10451

89 Units

Built in 2009

7 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
456 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 40 violations which is 0.44 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
13Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
15Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
12Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 03, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ..the ceiling and all walls in the 1st room from east at south located at apt 3i, 3rd story, 1st apartment from east at southNov sent out
Apr 03, 2024§ 27-2005 hmc: properly repair or replace the broken or defective ... rubber gasket seal around the refrigerator door in the kitchen located at apt 5i, 5th story, 1st apartment from east at southCiv14 mailed
Apr 03, 2024§ 27-2005 adm code properly secure the loose countertop at island cabinet... in the kitchen located at apt 4i, 4th story, 1st apartment from east at southNov sent out
Apr 03, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the 3rd room from east at south located at apt 3i, 3rd story, 1st apartment from east at southNov sent out
Apr 03, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color west wall... in the private hallway located at apt 2f, 2nd story, 4th apartment from east at southNov sent out
Apr 03, 2024§ 27-2005 hmc: properly repair or replace the broken or defective laminate at countertop at sink... in the kitchen located at apt 2h, 2nd story, 2nd apartment from east at southNov sent out
Apr 03, 2024§ 27-2005 adm code properly repair with similar material the broken or defective lower shelf inside sink cabinet... in the kitchen located at apt 2h, 2nd story, 2nd apartment from east at southNov sent out
Apr 03, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ...the ceiling and all walls in the kitchen located at apt 3i, 3rd story, 1st apartment from east at southNov sent out
Apr 03, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ...the ceiling and all walls in the 2nd room from east at south located at apt 3i, 3rd story, 1st apartment from east at southNov sent out
Apr 03, 2024§ 27-2005 hmc: properly repair or replace the broken or defective ..rubber gasket seal around refigerator door ... in the kitchen located at apt 4i, 4th story, 1st apartment from east at southNov sent out
Feb 23, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 5 sq ft at ceiling in the bathroom located at apt 5c, 5th story, 1st apartment from west at northNotice of issuance sent to tenant
Feb 23, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 4 sq. ft. at window casing in the 2nd room from north located at apt 5c, 5th story, 1st apartment from west at northNotice of issuance sent to tenant
Sep 08, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling, in the bathroom located at apt 4b, 4th story, 2nd apartment from west at northNov sent out

Property Owners and Associates

Adam Weinstein
Head Officer
2.8(14)

41 Properties

2130 Units

Cesar Caceras
Site Manager
2.7(3)

3 Properties

171 Units

Courtlandt Corners Ii Associates LP
Corporate Owner
2.7(3)

4 Properties

189 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet