20 Richman Plaza,Bronx, NY 10453

439 Units

Built in 1973

46 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
1000 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 178 violations which is 0.4 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
14Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
82Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
82Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Mar 19, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 2sq ft at ceiling in the bathroom located at apt 17k, 17th story, 1st apartment from south at westNotice of issuance sent to tenant
Mar 07, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall, east wall,and ceiling in the 2nd bathroom from east at south located at apt 30k, 30th story, 1st apartment from west at northNov sent out
Mar 07, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the private hallway located at apt 30k, 30th story, 1st apartment from west at northNov sent out
Mar 07, 2024§ 27-2005 hmc: properly repair or replace the broken or defective door knobs on the self-closing door in the entrance located at apt 22j, 22nd story, 1st apartment from south at westNov sent out
Feb 20, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the bathroom , the private hallway located at apt 31j, 34th story, 2nd apartment from east at southCiv14 mailed
Jan 04, 2024§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 6b, 6th story, 1st apartment from north at eastCiv14 mailed
Jan 04, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department .. all walls and ceiling in the entire apartment located at apt 6b, 6th story, 1st apartment from north at eastCiv14 mailed
Dec 19, 2023§ 27-2005 adm code properly repair with similar material the broken or defective wood wash basin cabinet in the bathroom located at apt 18h, 18th story, 1st apartment from east at southCiv14 mailed
Nov 03, 2023§ 27-2005 hmc: properly repair or replace the broken or defective bell/buzzer/intercom from building entrance to the west wall in the kitchen located at apt 22j, 23rd story, 2nd apartment from east at southNov sent out
Aug 30, 2023§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 7g, 7th story, 3rd apartment from north at eastNov sent out
Jun 17, 2023§ 27-2005 hmc: properly repair or replace the broken or defective base cabinet door at north wall in the entire apartment located at apt 28f, 28th story, 2nd apartment from north at eastNov sent out
Jun 13, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 1st room from east at north, the bathroom , the private hallway located at apt 34d, 34th story, 2nd apartment from west at northNot complied with
Dec 30, 2021§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 36f, 39th story, 2nd apartment from north at eastFirst no access to re- inspect violation
Dec 30, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 2nd room from north located at apt 36f, 39th story, 2nd apartment from north at eastFirst no access to re- inspect violation

Property Owners and Associates

Aliya Edmonds
Site Manager
2.2(6)

6 Properties

1746 Units

Denise Lee
Site Manager
2.2(6)

6 Properties

1746 Units

Eugene Schneur
Head Officer
2.7(17)

69 Properties

3991 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Terrible place!!!
Former Tenant
Pros:
Nothing at all
Cons:
Everything is just a disaster
Advice to owner:
Needs a lot of help