175 Hawthorne Street,Brooklyn, NY 11225

67 Units

Built in 1955

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
273 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 105 violations which is 1.56 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
32Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
49Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
24Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 11, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 2j, 2nd story, 1st apartment from north at eastNov sent out
Apr 11, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 2j, 2nd story, 1st apartment from north at eastNov sent out
Apr 11, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 4 sq ft at the north wall and east wall in the 1st room from east at north located at apt 2j, 2nd story, 1st apartment from north at eastNotice of issuance sent to tenant
Apr 11, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east at north located at apt 2j, 2nd story, 1st apartment from north at eastNov sent out
Apr 11, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east at north located at apt 2j, 2nd story, 1st apartment from north at eastNov sent out
Mar 18, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the entrance located at apt 6e, 6th story, 2nd apartment from south at westNov sent out
Mar 14, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at 1st window frame from west at north wall in the 4th room from east at north located at apt 2j, 2nd story, 1st apartment from north at eastNov sent out
Mar 14, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation at 1st radiator from west at north wall in the 4th room from east at north located at apt 2j, 2nd story, 1st apartment from north at eastNov sent out
Mar 14, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at west wall in the 4th room from east at north located at apt 2j, 2nd story, 1st apartment from north at eastNov sent out
Mar 14, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at south wall in the kitchen located at apt 2j, 2nd story, 1st apartment from north at eastNov sent out
Mar 14, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation at 1st radiator from north at east wall in the kitchen located at apt 2j, 2nd story, 1st apartment from north at eastNov sent out
Dec 18, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the east and west walls in the private hallway located at apt 5a, 5th story, 4th apartment from north at eastNov sent out
Dec 18, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, east and west walls in the kitchen located at apt 5a, 5th story, 4th apartment from north at eastNov sent out
Dec 18, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceilings throughout. in the entire apartment located at apt 5a, 5th story, 4th apartment from north at eastNov sent out
Dec 12, 2023§ 27-2005 adm code properly secure the loose wooden saddle at entrance in the bathroom located at apt 6f, 6th story, 3rd apartment from south at westNov sent out
Dec 12, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at west located at apt 6f, 6th story, 3rd apartment from south at westNov sent out
Dec 06, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the 1st bathroom from east at south located at apt 1b, 1st story, 3rd apartment from north at eastNov sent out
Dec 06, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st bathroom from east at south located at apt 1b, 1st story, 3rd apartment from north at eastNov sent out
Dec 06, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation the riser pipe at south in the 1st bathroom from east at south located at apt 1b, 1st story, 3rd apartment from north at eastNov sent out
Dec 03, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at east in the foyer located at apt 1b, 1st story, 3rd apartment from north at eastNov sent out
Dec 03, 2023§ 27-2037, 2038 hmc: provide a safe and adequate supply of electric service to the fixtures at ceiling in the kitchen located at apt 1b, 1st story, 3rd apartment from north at eastNov sent out
Dec 03, 2023§ 27-2005 adm code properly repair with similar material the broken or defective marble saddle in the entrance in the 1st bathroom from east at north located at apt 1b, 1st story, 3rd apartment from north at eastNov sent out
Dec 03, 2023§ 27-2026 adm code repair the leaky and/or defective faucets at bathtub in the 1st bathroom from east at north located at apt 1b, 1st story, 3rd apartment from north at eastNov sent out
Dec 03, 2023§ 27-2005 hmc: properly repair or replace the broken or defective counter balances window upper sash at south in the 3rd room from east located at apt 1b, 1st story, 3rd apartment from north at eastNov sent out
Jun 28, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from east located at apt 1k, 1st story, 1st apartment from north at eastNot complied with
Oct 18, 2022§ 27-2005 adm code properly repair with similar material the broken or defective wooden base at the base cabinet of the sink in the kitchen located at apt 4g, 4th story, 4th apartment from south at westFirst no access to re- inspect violation
Aug 12, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 2c, 2nd story, 2nd apartment from south at westFirst no access to re- inspect violation
Aug 08, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 2nd window frame from east at south wall, 1st window frame from east at south wall in the 1st room from east located at apt 2c, 2nd story, 1st apartment from south at westFirst no access to re- inspect violation
Jun 06, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 3rd room from east, the 3rd room from east, the kitchen , the private hallway located at apt 2c, 2nd story, 1st apartment from south at westFirst no access to re- inspect violation
Jun 05, 2019§ 27-2005 adm code replace with new the missing heat riser escutcheon plate at ceiling in the bathroom located at apt 4g, 4th story, 3rd apartment from south at westFirst no access to re- inspect violation
Mar 02, 2019§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling near the south wall in the 3rd room from east at south located at apt 6e, 6th story, 2nd apartment from south at westNot complied with
Oct 29, 2014§ 27-2043 adm code provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also chain door guard in the entrance located at apt 3f, 3rd story, 3rd apartment from south at westFirst no access to re- inspect violation

Property Owners and Associates

111/113 Fifth LLC & 1229 Halsey LLC
Corporate Owner
2.7(28)

41 Properties

1044 Units

3900 Harper Avenue, LLC
Owner
3.2(2)

1 Property

67 Units

Andrew Vega
Site Manager
3.2(2)

1 Property

67 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Wish I had better things to say
Former Tenant
Pros:
Large Space, Prime Location, Closet (c) openigl...
Cons:
Dimly lit, gross staircases, loud (c) openigloo...
Advice to owner:
Make sure the people hired to repair, fix, or d...
Inhuman corporate management
Former Tenant
Pros:
The apartment was large and (c) openigloo spaci...
Cons:
Management doesn't adhere to basic (c) openiglo...