50 East 19 Street,Brooklyn, NY 11226

54 Units

Built in 1935

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
232 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 148 violations which is 2.74 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
28Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
66Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
54Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 14, 2024§ 27-2005 adm code properly secure the loose escutcheon plate at the riser top in the bathroom located at apt f6, 6th story, 3rd apartment from south at westNov sent out
Apr 14, 2024§ 27-2005 adm code replace with new the missing escutcheon plate at the riser bottom in the bathroom located at apt f6, 6th story, 3rd apartment from south at westNov sent out
Apr 14, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls in the bathroom located at apt f6, 6th story, 3rd apartment from south at westNov sent out
Apr 14, 2024§ 27-2005 hmc: properly repair or replace the broken or defective entrance door in the bathroom located at apt f6, 6th story, 3rd apartment from south at westNov sent out
Apr 10, 2024§ 27-2005 adm code properly secure the loose window frame at west in the 1st room from north located at apt f6, 6th story, 3rd apartment from south at westNov sent out
Apr 10, 2024§ 27-2005 hmc: properly repair or replace the broken or defective intercom system leading from the building entrance to the east wall in the foyer located at apt e1, 5th story, 3rd apartment from north at eastNov sent out
Apr 10, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the kitchen located at apt e1, 5th story, 3rd apartment from north at eastNov sent out
Mar 28, 2024§ 27-2005 adm code replace with new the missing escutcheon plate at the riser top and bottom in the 1st bathroom from north located at apt f8, 6th story, 1st apartment from north at eastNov sent out
Mar 28, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls in the 2nd room from north at east located at apt f8, 6th story, 1st apartment from north at eastNov sent out
Mar 28, 2024§ 27-2026 adm code repair the leaky and/or defective faucets at the washbasin in the 2nd bathroom from north located at apt f8, 6th story, 1st apartment from north at eastNov sent out
Mar 28, 2024§ 27-2005 adm code properly repair with similar material the broken or defective wooden window frame in the 2nd bathroom from north located at apt f8, 6th story, 1st apartment from north at eastNov sent out
Mar 28, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and the ceiling in the kitchen located at apt f8, 6th story, 1st apartment from north at eastNov sent out
Mar 28, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 4sq ft at the east wall in the 1st bathroom from north located at apt f8, 6th story, 1st apartment from north at eastCiv14 mailed
Apr 16, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at east, the 3rd room from north at west, the bathroom , the foyer located at apt e1, 5th story, 1st apartment from north at eastNot complied with
Apr 16, 2022§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color .. west wall in the kitchen located at apt e1, 5th story, 1st apartment from north at eastNot complied with
Apr 13, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 1st bathroom from north located at apt f6, 6th story, 1st apartment from south at west , section at northNov sent out
Mar 07, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east and west wall in the private hallway located at apt e1, 5th story, 1st apartment from north at eastNot complied with
Mar 07, 2022§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st door at west in the foyer located at apt e1, 5th story, 1st apartment from north at eastNot complied with
Mar 07, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the west and east wall in the foyer located at apt e1, 5th story, 1st apartment from north at eastNot complied with
Aug 18, 2021§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north at east located at apt e1, 5th story, 3rd apartment from north at eastNot complied with
Aug 18, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the bathroom , the foyer , the 4th room from north at east located at apt e1, 5th story, 3rd apartment from north at eastNot complied with
Aug 26, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling, 2nd closet from east at south wall door, north wall, 2nd window frame from west at north wall, 1st window frame from west at north wall in the 1st room from north at east located at apt a8, 1st story, 1st apartment from north at eastNov sent out
Aug 26, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall in the foyer located at apt a8, 1st story, 1st apartment from north at eastNov sent out
Aug 26, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall in the 1st bathroom from north at west located at apt a8, 1st story, 1st apartment from north at eastNov sent out
Aug 26, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the south wall, east wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 3rd room from north at east located at apt a8, 1st story, 1st apartment from north at eastNov sent out
Aug 26, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling, east wall, 1st window frame from west at north wall in the kitchen located at apt a8, 1st story, 1st apartment from north at eastNov sent out
Jun 03, 2020Section 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at north and west walls, approximately 2 sq. feet in the 1st bathroom from east located at apt a8, 1st story, 1st apartment from north at east , section at northViolation will be reinspected
Jan 25, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department south wall in the bathroom located at apt d1, 4th story, 1st apartment from north at east , section at northCertification postponment granted

Property Owners and Associates

215 Martense LLC
Corporate Owner
4(1)

2 Properties

83 Units

465 Ocean LLC
Corporate Owner
4(1)

2 Properties

95 Units

535-539 West 162nd LLC
Corporate Owner
3.6(4)

4 Properties

157 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Great Building.
Former Tenant
Pros:
- Super is amazing. Very (c) openigloo attentiv...
Cons:
- slight leak here and (c) openigloo there.