460 East 21 Street,Brooklyn, NY 11226

69 Units

Built in 1959

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
297 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 148 violations which is 2.14 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
26Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
63Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
59Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Mar 11, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation door in the entrance located at apt 2h, 2nd story, 4th apartment from south at westCiv14 mailed
Mar 11, 2024§ 27-2005 adm code properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt 2h, 2nd story, 4th apartment from south at westCiv14 mailed
Mar 11, 2024§ 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 2h, 2nd story, 4th apartment from south at westCiv14 mailed
Feb 17, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the foyer located at apt 2h, 2nd story, 2nd apartment from south at west , section ''north''Civ14 mailed
Feb 17, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling, 1st closet from south at west wall door, baseboard at south wall, south wall in the foyer located at apt 2h, 2nd story, 2nd apartment from south at west , section ''north''Civ14 mailed
Feb 17, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation at 1st closet from south at west wall door frame in the foyer located at apt 2h, 2nd story, 2nd apartment from south at west , section ''north''Civ14 mailed
Feb 17, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west, the bathroom , the kitchenette located at apt 2h, 2nd story, 2nd apartment from south at west , section ''north''Civ14 mailed
Feb 17, 2024§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl at west wall in the bathroom located at apt 2h, 2nd story, 2nd apartment from south at west , section ''north''Civ14 mailed
Feb 17, 2024§ 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 2h, 2nd story, 2nd apartment from south at west , section ''north''Civ14 mailed
Jan 19, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 4sq ft at the shower stall in the 1st bathroom located at apt 3a, 3rd story, 5th apartment from north at eastCiv14 mailed
Jan 19, 2024§ 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles at the shower stall in the 1st bathroom located at apt 3a, 3rd story, 5th apartment from north at eastCiv14 mailed
Jan 18, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak from the ceiling at east in the 3rd room from north at east located at apt 3a, 3rd story, 5th apartment from north at eastNov sent out
Jan 18, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 3rd room from north at east located at apt 3a, 3rd story, 5th apartment from north at eastNov sent out
Jan 18, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 3a, 3rd story, 5th apartment from north at eastNov sent out
Jan 18, 2024§ 27-2005 adm code properly repair with similar material the broken or defective ceramic wall tiles around the bathtub in the 2nd bathroom located at apt 3a, 3rd story, 5th apartment from north at eastCiv14 mailed
Jan 18, 2024§ 27-2005 adm code replace with new the missing escutcheon plates at the riser top and bottom in the 2nd bathroom located at apt 3a, 3rd story, 5th apartment from north at eastCiv14 mailed
Jan 18, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak from the ceiling at east in the 1st room from north at east located at apt 3a, 3rd story, 5th apartment from north at eastCiv14 mailed
Jan 18, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 1st room from north at east located at apt 3a, 3rd story, 5th apartment from north at eastCiv14 mailed
Oct 21, 2023§ 27-2005 hmc: properly repair or replace the broken or defective ventilation system in the 2nd bathroom from east located at apt 6a, 6th story, 5th apartment from north at eastNov sent out
Oct 03, 2023§ 27-2005 hmc: properly repair or replace the broken or defective locking device at vestibule door at public hall, 1st storyNov sent out
Sep 05, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 5f, 5th story, 1st apartment from west at northNot complied with
Jul 25, 2022§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east located at apt 5f, 5th story, 1st apartment from west at northNot complied with
Jul 25, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the west wall, north wall, east wall, ceiling, south wall in the kitchen located at apt 5f, 5th story, 1st apartment from west at northNot complied with
Jul 25, 2022§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st door frame from east at south wall, 1st radiator from west at north wall in the kitchen located at apt 5f, 5th story, 1st apartment from west at northNot complied with
Jul 25, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the bathroom , the 4th room from east located at apt 5f, 5th story, 1st apartment from west at northNot complied with
Feb 01, 2021§ 27-2005 adm code refit fire safety door to stairway at public hall, 1st story, section at southNot complied with

Property Owners and Associates

Ernesto Carillio
Site Manager
2(1)

1 Property

69 Units

Eva Stern 45 LLC
Agent, Corporate Owner
2.2(8)

4 Properties

278 Units

Isaac Stern
Head Officer
2.2(8)

4 Properties

278 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Declining property management
Former Tenant
Pros:
Been here since 2014 - (c) openigloo the rent i...
Cons:
- front door has been (c) openigloo broken for ...
Advice to owner:
Stop being a slum lord