9401 5 Avenue,Brooklyn, NY 11209

10 Units

Built in 1927

4 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
35 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 64 violations which is 6.4 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
19Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
38Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
7Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Jun 21, 2023§ 27-2048 adm code paint or post a sign indicating floors at walls on all floors at public hallNov sent out
Jun 21, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilint at public hallsNov sent out
Apr 12, 2023Section 27-2005 hmc: refit. bulkhead door at public hall, 4th storyNov sent out
Apr 12, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at bulkhead at public hall, 4th storyNov sent out
Apr 12, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at north wall at vestibule at public hall, 1st storyNov sent out
Mar 17, 2021Section 27-2005 adm code refit the door in the entrance located at apt 10, 4th story, 1st apartment from east at southNov sent out
Jan 06, 2021Section 27-2048 adm code paint or post a sign indicating floors near stairs at all stories at public hallNov sent out
Jan 06, 2021Section 27-2005 adm code properly repair with similar material the broken or defective caulking at north and east walls around bathtub in the bathroom located at apt 10, 4th story, 1st apartment from east at southNov sent out
Dec 30, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling at public hall bulkheadNov sent out
Dec 26, 2019Section 27-2040 adm code provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts mininmumNov sent out
Jun 19, 2018Section 27-2005 adm code properly repair with similar material the broken or defective wood floor in the kitchen located at apt 6, 3rd story, 2nd apartment from east at southNot complied with
Jun 19, 2018Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
Jun 19, 2018Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st storyNot complied with
Jun 19, 2018Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNot complied with
Mar 07, 2018Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl , in the bathroom located at apt 10, 4th story, 1st apartment from east at southNot complied with
Jan 05, 2018Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 10, 4th story, 1st apartment from east at southNot complied with
Jan 05, 2018Section 27-2005 adm code properly repair with similar material the broken or defective silicone caulk around bathtub in the bathroom located at apt 10, 4th story, 1st apartment from east at southNot complied with
Jan 05, 2018Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNot complied with
Jan 05, 2018Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with

Property Owners and Associates

9401 Realty Corp.
Owner, Corporate Owner
0(0)

4 Properties

19 Units

Bassam Amin
Shareholder, Officer
0(0)

4 Properties

19 Units

Chelsea Eights Condominium
Owner, Corporate Owner
2.4(11)

64 Properties

888 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet