2176 80 Street,Brooklyn, NY 11214

54 Units

Built in 1922

4 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
203 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 194 violations which is 3.59 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
32Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
110Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
52Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Feb 20, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 5 sq ft at west wall in the kitchen located at apt c21, 2nd story, 2nd apartment from south at west , section ''south''Notice of issuance sent to tenant
Jan 03, 2024§ 27-2005 adm code replace with new the missing escutcheon plate at riser at ceiling in the bathroom located at apt c23, 2nd story, 1st apartment from east at southNov sent out
Jan 03, 2024§ 27-2005 adm code properly repair with similar material the broken or defective caulking around bath tub in the bathroom located at apt c23, 2nd story, 1st apartment from east at southNov sent out
Dec 06, 2023§ 27-2021 adm code provide place within the building for the storage of waste receptacles and disinfect same regularly.Nov certified on time
Nov 02, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall, ceiling in the foyer located at apt b34, 3rd story, 1st apartment from west at northCiv14 mailed
Nov 02, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door, 1st door from north at east wall, 1st door from north at east wall, 1st closet from north at east wall door in the 2nd room from north at west located at apt b34, 3rd story, 1st apartment from west at northCiv14 mailed
Oct 22, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at center located at apt b12, 1st story, 2nd apartment from south at west , section ''b'', at westCiv14 mailed
Oct 09, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiliing at bulkhead to roof , section ''c'', at southNov certified on time
Oct 09, 2023§ 27-2005 adm code properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt c34, 3rd story, 2nd apartment from south at west , section ''c'', at southCiv14 mailed
Oct 04, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls at bulkhead at roof , section ''a''Nov certified on time
Oct 04, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the west wall at public hall, 2nd story, section ''a''Nov certified on time
Oct 04, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls at bulkhead at roof , section ''c'', at eastNov certified on time
Oct 04, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and east wall at bulkhead at roof , section ''c'', at westNov certified on time
Sep 07, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at 1st door from north at east wall, 1st closet from north at east wall door in the 2nd room from north at west located at apt b34, 3rd story, 1st apartment from west at north , 1st section from north at eastNov sent out
Apr 20, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls in the kitchen located at apt c21, 2nd story, 2nd apartment from south at westNov sent out
Apr 20, 2023Section 27-2005 adm code paint metal in accordance with dept. regulation the riser pipe in the 1st room from north at west located at apt c21, 2nd story, 2nd apartment from south at westNov sent out
Apr 20, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at bulkhead at public hall, 4th story, section ''southwest''Nov sent out
Nov 07, 2022Section 27-2005 adm code properly repair with similar material the broken or defective wood floor in the kitchen located at apt c15, 1st story, 1st apartment from south at west , section ''c'', at southFalse certification
Oct 12, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door in the 2nd room from north at west located at apt b34, 3rd story, 1st apartment from west at northNov sent out
Oct 12, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from north at west located at apt b34, 3rd story, 1st apartment from west at northNov sent out
Oct 12, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen , the foyer , the 1st room from north at west located at apt b34, 3rd story, 1st apartment from west at northNov sent out
Jun 08, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 2nd room from north at west, the bathroom , the kitchen located at apt b34, 3rd story, 1st apartment from west at north , section ''east''Nov sent out
Mar 03, 2021Section 27-2011 adm code cleanse to the satisfaction of this department the ceramic tiles surface and grouted joints of visible (mold) at west walls at bathtub in the bathroom located at apt c34, 3rd story, 2nd apartment from east at south , section ''(c)'', at eastNot complied with
Mar 18, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt b24, 2nd storyNov sent out
Mar 16, 2020Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt b24, 2nd story, 1st apartment from north at east , section ''b'', at southNov sent out
Mar 16, 2020Section 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt b24, 2nd story, 1st apartment from north at east , section ''b'', at southNov sent out
Jan 02, 2019Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling at heat riser in the bathroom located at apt b24, 2nd story, 2nd apartment from west at northNov sent out
Jan 02, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt b24, 2nd story, 2nd apartment from west at northNov sent out
Jan 02, 2019Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling at heat riser in the kitchen located at apt b24, 2nd story, 2nd apartment from west at northNov sent out
Feb 13, 2015Section 27-2005 adm code replace with new the missing escutcheon plate at heat riser at ceiling in the kitchen located at apt b24, 2nd story, 1st apartment from west at northNot complied with
Mar 08, 2013Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt b24, 2nd story, 1st apartment from west at north , section at northeastNot complied with
Feb 19, 2013Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt b24, 2nd story, 2nd apartment from west at northNot complied with

Property Owners and Associates

Bay Parkway Assoc Holdings LLC
Agent, Corporate Owner
2.4(2)

2 Properties

94 Units

Benzion Reifer
Officer, Head Officer
3(9)

13 Properties

187 Units

Daniel Pinchos
Site Manager
2.4(2)

1 Property

54 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Not the best not the worst
Former Tenant
Pros:
Not much tbh
Cons:
Lived here before this new (c) openigloo manage...
Advice to owner:
Give a shit more
Stole my packages all the time, and many insects
Former Tenant
Pros:
It was spacious, very bright.
Cons:
Lots of insects, Bad caulking job, (c) openiglo...