8320 Bay Parkway,Brooklyn, NY 11214

53 Units

Built in 1923

4 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
123 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 97 violations which is 1.83 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
15Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
68Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
14Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Mar 03, 2024§ 27-2026 adm code repair the leaky and/or defective faucets sinkk in the kitchen located at apt 4a, 3rd story, 2nd apartment from west at north , section ''south''Nov sent out
Mar 03, 2024§ 27-2005 adm code properly secure the loose electrical light switch at north wall. in the private hallway located at apt 4a, 3rd story, 2nd apartment from west at north , section ''south''Nov sent out
Oct 06, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at south wall and ceiling in the foyer located at apt c41, 4th story, 2nd apartment from west at northNov sent out
Oct 06, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling, east, south and west walls at public hall, 4th story, section ''north''Nov sent out
Oct 26, 2022Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hallNov sent out
Dec 05, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling, west wall, south wall and east wall at public hall, 4th storyNov sent out
Dec 14, 2018Section 27-2005 adm code properly repair the broken or defective inoperative bell, return buzzer and intercom system from 1st story public hall vestibule to apartment located at apt b31, 3rd story, 1st apartment from south at westNov sent out
Dec 01, 2018Section 27-2043 adm code provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also door chain guard in the entrance located at apt a2, 2nd story, 2nd apartment from east at southNov sent out
Nov 05, 2018Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story, section ''c''Invalid certification
Nov 05, 2018Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story, section ''c''Invalid certification
Jul 01, 2018Section 27-2043 adm code provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also door chain guard in the entrance located at apt b31, 3rd story, 1st apartment from west at north , section at northwestNov sent out
Jul 01, 2018Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st storyNov sent out
Jul 01, 2018Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing on wall at public hall, 1st storyNov sent out
Jul 01, 2018Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st storyNov sent out
Apr 09, 2015Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at east located at apt a4, 3rd story, 2nd apartment from north at east , section ''a'', 2nd from west at northNot complied with

Property Owners and Associates

8320 Parkway Towers C
Owner, Corporate Owner
3.8(1)

1 Property

53 Units

Runbiao Li
Site Manager, Agent, Head Officer
3.8(1)

1 Property

53 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Old cold building with warm nostalgia factor
Former Tenant
Pros:
Love the gardening in the (c) openigloo courtya...
Cons:
The building is in need (c) openigloo of repair...
Advice to owner:
Please do something about the heating/insulatio...