7101 Bay Parkway,Brooklyn, NY 11204

65 Units

Built in 1927

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
95 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 80 violations which is 1.23 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
15Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
42Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
23Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Feb 24, 2024§ 27-2005 hmc: properly repair or replace the broken or defective bell buzzer from building entrance to apartment in the foyer located at apt 5k, 5th story, 3rd apartment from west at northCiv14 mailed
Feb 20, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation riser pipe in the kitchen located at apt 5k, 5th story, 3rd apartment from west at northCiv14 mailed
Feb 02, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 6d, 6th story, 3rd apartment from north at eastCiv14 mailed
Feb 01, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from east located at apt 6d, 6th story, 3rd apartment from north at eastCiv14 mailed
Jan 11, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north, the kitchen , the 1st room from north, the 3rd room from north located at apt 5i, 5th story, 1st apartment from south at westNov sent out
Sep 21, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east , section ''north''Nov sent out
Sep 21, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl tiles at floor in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from north at east , section ''north''Nov sent out
Sep 21, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl tiles at floor in the 3rd room from east at north located at apt 1b, 1st story, 1st apartment from north at east , section ''north''Nov sent out
Sep 21, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt 1b, 1st story, 1st apartment from north at east , section ''north''Nov sent out
Sep 21, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl tiles at floor in the 2nd private hallway from north located at apt 1b, 1st story, 1st apartment from north at east , section ''north''Nov sent out
Jul 25, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt 1b, 1st story, apartment at westNot complied with
Apr 11, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt 1b, 1st story, apartment at southNot complied with
Jan 30, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls, ceilings and trims in the entire apartment located at apt 1b, 1st story, 1st apartment from south at westNot complied with
Oct 21, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 1b, 1st story, 1st apartment from south at westNot complied with
Aug 22, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 1b, 1st story, 1st apartment from east at southNot complied with

Property Owners and Associates

2020 Realty Holdings
Corporate Owner
2.1(16)

59 Properties

2839 Units

Linden 34 Realty Corp
Corporate Owner
1.6(1)

2 Properties

107 Units

Moshe Piller
Site Manager, Agent, Head Officer
2.2(15)

54 Properties

2566 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Never Rent Here
Former Tenant
Pros:
You can rent without background (c) openigloo c...
Cons:
it is a very old (c) openigloo building with a ...