1282 Ocean Avenue,Brooklyn, NY 11230

66 Units

Built in 1935

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
57 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 178 violations which is 2.69 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
21Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
83Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
74Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 01, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 2 sq ft at south wall in the bathroom located at apt 4c, 4th story, 1st apartment from north at eastNotice of issuance sent to tenant
Apr 01, 2024§ 27-2005 hmc: properly repair or replace the broken or defective counter balance upper sash window in the kitchen located at apt 4c, 4th story, 1st apartment from north at eastCiv14 mailed
Mar 28, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st storyNov certified on time
Mar 28, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation at riser in the bathroom located at apt 2e, 2nd story, 3rd apartment from north at eastCiv14 mailed
Mar 28, 2024§ 27-2005 adm code replace with new the missing escutcheon plate at riser at the ceiling in the bathroom located at apt 2e, 2nd story, 3rd apartment from north at eastCiv14 mailed
Mar 26, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 2h, 2nd story, 1st apartment from north at east , section ''east''Nov sent out
Feb 02, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north located at apt 2e, 2nd story, 3rd apartment from north at eastCiv14 mailed
Feb 02, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 2e, 2nd story, 3rd apartment from north at eastCiv14 mailed
Feb 02, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 1 sq ft at the south wall in the bathroom located at apt 2e, 2nd story, 3rd apartment from north at eastFirst no access to re- inspect violation
Feb 02, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 2 sq ft at the west wall in the bathroom located at apt 2e, 2nd story, 3rd apartment from north at eastFirst no access to re- inspect violation
Feb 02, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 1 sq ft at the ceiling in the bathroom located at apt 2e, 2nd story, 3rd apartment from north at eastFirst no access to re- inspect violation
Feb 02, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at south located at apt 2e, 2nd story, 3rd apartment from north at eastCiv14 mailed
Feb 02, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt 2e, 2nd story, 3rd apartment from north at eastCiv14 mailed
Feb 02, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st private hallway located at apt 2e, 2nd story, 3rd apartment from north at eastCiv14 mailed
Feb 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the 1st room from east at north located at apt 2e, 2nd story, 3rd apartment from north at eastCiv14 mailed
Feb 02, 2024§ 27-2026 adm code repair the leaky and/or defective faucets at sink in the kitchen located at apt 2e, 2nd story, 3rd apartment from north at eastCiv14 mailed
Feb 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd private hallway , the 1st room from east at south, the 2nd room from east at south, the bathroom , the 1st private hallway , the kitchen located at apt 2e, 2nd story, 3rd apartment from north at eastCiv14 mailed
Oct 25, 2023§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration exit corridor and stair modified to masonry ramp leaving improper headroom at northeast section, building front, at fire passage wayNot complied with
Jun 29, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at east, the foyer , the kitchen , the private hallway , the 2nd room from north at east located at apt 5b, 5th story, 1st apartment from west at northFirst no access to re- inspect violation
Nov 30, 2018§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen , the 1st room from north at east, the 2nd room from north at center located at apt 3c, 3rd story, 1st apartment from north at eastFirst no access to re- inspect violation
Jun 19, 2016§ 27-2013 adm code paint with light colored paint to the satisfaction of this department north wall & ceiling in the kitchen located at apt 5k, 5th story, 1st apartment from west at north , section at westFirst no access to re- inspect violation

Property Owners and Associates

1280 Realty NY LLC
Owner, Corporate Owner
4.5(1)

2 Properties

106 Units

961 Realty LLC
Owner, Corporate Owner
2.7(87)

87 Properties

3609 Units

Eddie Ljesnjanin
Site Manager, Agent, Head Officer
2.6(5)

2 Properties

137 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Community gem here
Former Tenant
Pros:
We all knew each other. (c) openigloo It’s was ...
Cons:
Pests were seen in the (c) openigloo halls VOMI...
Advice to owner:
Ask about everything