178 Nassau Street,Brooklyn, NY 11201

103 Units

Built in 2013

10 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
33 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 60 violations which is 0.58 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
38Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
17Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
4Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Apr 09, 2021Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Feb 08, 2021Section 27-2011 adm code cleanse to the satisfaction of this department the ceramic tiles with grouted joints / caulking surface of visible mold at south and east walls at shower stall in the 2nd bathroom from east at center located at apt 10c, 10th story, 1st apartment from south at westNov sent out
Feb 08, 2021Section 27-2011 adm code cleanse to the satisfaction of this department the ceramic tiles with grouted joints / caulking surface of visible mold at north, east and west walls at bathtub in the 1st bathroom from north at center located at apt 10c, 10th story, 1st apartment from south at westNov sent out
Feb 08, 2021Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Feb 08, 2021Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Jan 21, 2021Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Jan 21, 2021Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Oct 16, 2019Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyInvalid certification
Oct 16, 2019Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st storyInvalid certification
Oct 16, 2019Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st storyInvalid certification
Oct 16, 2019Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyInvalid certification
Oct 16, 2019Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st storyInvalid certification
Oct 16, 2019Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedInvalid certification
Jul 09, 2019Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Jul 09, 2019Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ( frame missing ) at public hall, 1st storyNov sent out
Jul 09, 2019Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ( notice missing ) at public hall, 1st storyNov sent out
Jul 09, 2019Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st storyNov sent out
Jul 09, 2019Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Jul 09, 2019Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.Nov sent out
Mar 20, 2019Section 27-2005 adm code properly repair the broken or defective bellbuzzer/ intercom from building entrance to apartment located at apt 10k, 10th story, 2nd apartment from west at northNot complied with
Jun 06, 2018Section 27-2005 adm code properly repair the broken or defective from foyer control box return buzzer system to 1sty public hall in vestibule located at apt 10k, 10th storyNov sent out
Oct 25, 2017Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out
Oct 25, 2017Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Oct 25, 2017Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st storyNov sent out
Oct 25, 2017Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing on wall at public hall, 1st storyNov sent out
Oct 25, 2017Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNov sent out
Oct 25, 2017Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing on wall at public hall, 1st storyNov sent out
Jun 16, 2017Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Jun 16, 2017Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st storyNov sent out
Jun 16, 2017Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Jun 16, 2017Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st storyNov sent out
Jun 16, 2017Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st storyNov sent out
Jun 16, 2017Section 27-2053 adm code post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st storyNov sent out
Jun 16, 2017Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNov sent out
Jun 16, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling & west wall near apartment #10n at public hall, 10th storyNov sent out
May 12, 2017Section 27-2005 hmc:trace and repair the source and abate the nuisance consisting of mold ... approx. 1 sq.ft. at lower northwest section of west wall in the 1st room from east at north located at apt 9m, 9th story, 1st apartment from north at eastNov sent out
May 12, 2017Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color wall at upper westcenter section in the private hallway located at apt 9m, 9th story, 1st apartment from north at eastNov sent out
Aug 17, 2015Section 27-2013 adm code paint with light colored paint to the satisfaction of this department west wall at west stairs at public hall, 9th storyInvalid certification

Property Owners and Associates

183 Chauncey, LLC
Officer
4.5(1)

2 Properties

106 Units

Brooklyn Warehouse, LLC
Corporate Owner
4.5(1)

2 Properties

106 Units

Rem Residential
Agent
4.5(1)

1 Property

103 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Good place live
Former Tenant
Pros:
Building staff is great and (c) openigloo lots ...
Cons:
Some maintenance requests take a (c) openigloo ...