Aug 15, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at east wall and ceiling in the 3rd room from east located at apt da3, 1st story, 2nd apartment from west at northNov sent out
Aug 15, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at north wall, west wall, south wall and ceiling in the closet in the 3rd room from east located at apt da3, 1st story, 2nd apartment from west at northNov sent out
Dec 23, 2020§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story, section ''f'', at southInvalid certification
Dec 23, 2020§ 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., section ''f'', at southInvalid certification
Dec 23, 2020§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, section ''f'', at southInvalid certification