70-29 66 Street,

Queens, NY 11385

6 Units

Built in 1927

3 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform

Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 74 violations which is 12.33 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.59 violations per unit.
Non-hazardous
13Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
37Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
24Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
2021-12-30Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and all walls throughout in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at northNov sent out
2021-11-23Section 27-2005 adm code properly repair with similar material the broken or defective vinyl tile on floor in the kitchen located at apt 1l, 1st story, 1st apartment from west at northNov sent out
2021-11-23Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from west at northNov sent out
2021-10-15Section 27-2005 adm code paint metal in accordance with dept. regulation metal ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from east at southNov sent out
2021-09-15Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east, the bathroom located at apt 3r, 3rd story, 1st apartment from east at southInvalid certification
2021-09-09Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyInvalid certification
2021-08-23Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st storyNov sent out
2021-08-23Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st storyInvalid certification
2021-05-23Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
2021-05-23Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st storyNov sent out
2021-05-23Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.Nov sent out
2021-05-23Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out
2013-06-06Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen , the 2nd room from east, the 3rd room from east, the 5th room from east located at apt 3r, 3rd story, 1st apartment from east at southNov sent out
Property Owners and Associates
Antonina Spallino
Agent, Site Manager, Head Officer, Shareholder, Lessee
0(0)

4 Properties

19 Units

Antonina Spallino & Pietro Spallino Revocable Trus
Corporate Owner
0(0)

3 Properties

14 Units

Antonina Spallino Revocable Trust
Owner
0(0)

7 Properties

20 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.
Reviews
No reviews yet