183-18 140 Avenue,Queens, NY 11413

2 Units

Built in 1950

2 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
63 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 201 violations which is 100.5 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
31Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
147Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
23Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Oct 20, 2023§ 27-2005 admin. code: properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 2fl, 2nd story, 1st apartment from east at southNov sent out
Oct 20, 2023§ 27-2005 admin. code: properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt 2fl, 2nd story, 1st apartment from east at southNov sent out
Oct 20, 2023§ 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color the north wall in the kitchen located at apt 2fl, 2nd story, 1st apartment from east at southNov sent out
Oct 20, 2023§ 27-2005 hmc: properly repair or replace the broken or defective hinges at sink base cabinet doors in the kitchen located at apt 2fl, 2nd story, 1st apartment from east at southNov sent out
Oct 20, 2023§ 27-2005 hmc: properly repair or replace the broken or defective hinges at south wall cabinet doors in the kitchen located at apt 2fl, 2nd story, 1st apartment from east at southNov sent out
Oct 05, 2023§ 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north at west located at apt topflo, 2nd story, 1st apartment from west at northNov sent out
Oct 05, 2023§ 27-2005 admin. code: properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from north at east located at apt topflo, 2nd story, 1st apartment from west at northNov sent out
Sep 13, 2023§ 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the private hallway , the 2nd room from north, the bathroom located at apt 1, 1st story, 1st apartment from east at southNov sent out
Sep 08, 2023§ 27-2026 admin. code: repair the flushing apparatus and maintain same so as to flush effectively the water closet . in the bathroom located at apt 2, 2nd story, 2nd apartment from east at southNov sent out
Sep 08, 2023§ 27-2005 admin. code: properly repair with similar material the broken or defective ceramic tile on east and west walls in the bathroom located at apt 2, 2nd story, 2nd apartment from east at southNov sent out
Sep 08, 2023§ 27-2005 adm code replace with new the missing escutcheon plate on tub spout in the bathroom located at apt 2, 2nd story, 2nd apartment from east at southNov sent out
Sep 07, 2023§ 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north located at apt 2, 2nd story, 2nd apartment from east at southNov sent out
Aug 09, 2023§ 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west, the 2nd room from north at east, the kitchen , the 2nd room from north at west, the private hallway located at apt 1fl, 1st story, 1st apartment from east at southNov sent out
Jun 11, 2023§ 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 1st room from north at west, the private hallway located at apt 1fl, 1st story, 1st apartment from east at southInvalid certification
May 11, 2023Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from north at east, the kitchen , the 2nd room from north at east, the private hallway , the 2nd room from north at west, the 1st room from north at west located at apt 1, 1st story, 1st apartment from east at southNov sent out
Feb 28, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department , 1st window frame from south at west wall in the 3rd room from north at west located at apt 1, 1st story, 1st apartment from west at northNov sent out
Feb 28, 2023Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 1st room from north at east, the 3rd room from north at east, the kitchen located at apt 1, 1st story, 1st apartment from west at northNov sent out
May 25, 2022Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all walls, ceilings, doors,and mouldings in the entire apartment located at apt bldg, 2nd story, 2nd apartment from east at southNov sent out
Nov 14, 2021Section 27-2005 admin. code: properly repair the broken or defective sink base cabinet and counter top in the kitchen located at apt topflo, 2nd story, 1st apartment from east at southNov sent out
Nov 14, 2021Section 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color south wall in the bathroom located at apt topflo, 2nd story, 1st apartment from east at southNov sent out
Nov 10, 2021Section 27-2005 admin. code: properly secure the loose base cabinet doors in the kitchen located at apt 2fl, 2nd story, 2nd apartment from east at southNov sent out
Oct 09, 2020Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all walls & ceiling in the kitchen located at apt topfl, 2nd storyNov sent out
Apr 14, 2020Section 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st bedroom from east at south located at apt topflo, 2nd story, 1st apartment from north at eastNov sent out
Apr 14, 2020Section 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 2nd bedroom from east at south located at apt topflo, 2nd story, 1st apartment from north at eastNov sent out
Apr 14, 2020Section 27-2005 admin. code: properly secure the loose base cabinet door in the kitchen located at apt topflo, 2nd story, 1st apartment from north at eastNov sent out
Apr 14, 2020Section 27-2005 admin. code: properly secure the loose wall cabinet door in the kitchen located at apt topflo, 2nd story, 1st apartment from north at eastNov sent out
May 12, 2014Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all ceilings and walls in the entire apartment located at apt 2fl, 2nd storyNov sent out
Oct 15, 2013Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department ceiling in the kitchen located at apt top, 2nd storyNov sent out
Oct 15, 2013Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department ceiling and walls throughout in the entire apartment located at apt top, 2nd storyNov sent out
Mar 14, 2013Section 27-2005 admin. code: properly repair with similar material the broken or defective wood floor in the 2nd room from east at south located at apt topf, 2nd storyNov sent out
Mar 14, 2013Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all walls and ceiling thru-out in the entire apartment located at apt topf, 2nd storyNov sent out

Property Owners and Associates

18318 LLC
Owner, Corporate Owner, Agent
0(0)

1 Property

2 Units

Felix Ogieva
Head Officer
0(0)

1 Property

2 Units

Happiness Idehen
Officer
0(0)

1 Property

2 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet