404 8 Avenue,Manhattan, NY 10001

12 Units

Built in 1900

5 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
62 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 112 violations which is 9.33 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
17Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
69Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
26Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Nov 07, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at south located at apt 3r, 3rd story, 1st apartment from north at eastNov sent out
Aug 06, 2021Section 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at building front at fire escapeNov sent out
Aug 06, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th storyNov sent out
Aug 06, 2021Section 27-2005 adm code properly repair with similar material the broken or defective flashing at north wallNov sent out
Jun 23, 2020Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at east and west walls in the kitchen located at apt 3r, 3rd story, 1st apartment from north at eastNov sent out
Jun 23, 2020Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd bathroom from east located at apt 3r, 3rd story, 1st apartment from north at eastNov sent out
Jun 23, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from east at north located at apt 3r, 3rd story, 1st apartment from north at eastNov sent out
Nov 14, 2019Section 27-2005 adm code refit lower window sash at east wall in the 1st room from east at south located at apt 3r, 3rd story, 1st apartment from north at eastInvalid certification
Oct 24, 2019Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl at floor in the 1st bathroom from east located at apt 3r, 3rd story, 1st apartment from north at eastInvalid certification
Mar 09, 2018Section 27-2021 adm code provide place within the building for the storage of waste receptacles and disinfect same regularly. at public hall, 1st storyNov sent out
Mar 09, 2018Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from north at eastNov sent out
Jan 31, 2018Section 27-2005 adm code paint metal in accordance with dept. regulation heat riser at east wall in the bathroom located at apt 3r, 3rd story, 1st apartment from north at eastNot complied with
Dec 03, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from north at eastNot complied with
Sep 03, 2017Section 27-2005 hmc:trace and repair the source and abate the nuisance consisting of mold ... at ceiling 1 sq. ft. in the bathroom located at apt 3r, 3rd story, 1st apartment from north at eastNot complied with
Sep 03, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 3r, 3rd storyNot complied with
Aug 25, 2017Section 27-2053 adm code post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st storyNot complied with
Aug 08, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from north at eastNot complied with

Property Owners and Associates

Hassan Alborati
Site Manager, Shareholder, Head Officer
2.5(2)

1 Property

12 Units

Zik Realty Corp.
Owner, Corporate Owner, Agent
2.5(2)

1 Property

12 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Not bad
Former Tenant
Pros:
Good value for the rent
Cons:
Extremely loud street noise, lots (c) openigloo...
Advice to owner:
Fix the heat and water issues
DO NOT LIVE HERE
Former Tenant
Pros:
Location is central Rent price is (c) openigloo...
Cons:
-this landlord is a scam (c) openigloo artist a...
Advice to owner:
Dont shamelessly lie and take advantage of people