Jan 11, 2024§ 27-2011 adm code cleanse to the satisfaction of this department the cermic tiles at east wall and remove all presents of mold and mildew in the bathroom located at apt 8f, 8th story, 1st apartment from west at northNov sent out
Dec 22, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at east located at apt 8f, 7th story, 1st apartment from west at northNov sent out
Dec 05, 2023§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl and make level in the bathroom located at apt 8f, 8th story, 1st apartment from west at northNov sent out
Mar 03, 2021Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl and make level in the bathroom located at apt 8f, 8th story, 1st apartment from west at northFirst no access to re- inspect violation
Jan 12, 2021Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floorNot complied with