481 Lenox Avenue,Manhattan, NY 10030

160 Units

Built in 1963

16 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
62 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 44 violations which is 0.27 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
18Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
23Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
3Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
May 03, 2023Section 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles at the south wall in the kitchen located at apt 10b, 10th story, 2nd apartment from south at westNov sent out
May 02, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at the north wall in the 1st room from north located at apt 16c, 16th story, 3rd apartment from south at westNov sent out
May 02, 2023Section 27-2005 hmc: refit. closet door at the south in the 2nd room from north at west located at apt 10b, 10th story, 2nd apartment from south at westNov sent out
May 02, 2023Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at the north wall in the 2nd room from north at west located at apt 16c, 16th story, 3rd apartment from south at westNov sent out
May 02, 2023Section 27-2005 hmc: refit. doors at sink base cabinet in the kitchen located at apt 16c, 16th story, 3rd apartment from south at westNov sent out
May 02, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the kitchen located at apt 16c, 16th story, 3rd apartment from south at westNov sent out
Jan 03, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the kitchen located at apt 16c, 16th story, 3rd apartment from south at westNov sent out
Jan 03, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls in the foyer located at apt 16c, 16th story, 3rd apartment from south at westNov sent out
Jan 03, 2023Section 27-2005 adm code refit door to staircase at south at public hall, 1st story, section ''a''Nov sent out
Dec 27, 2022Section 27-2048 adm code paint or post a sign indicating floors electric outlet covers or caps at west wall at public hall, 16th storyNov sent out
Dec 27, 2022Section 27-2048 adm code paint or post a sign indicating floors electric outlet covers or caps at west wall at public hall, 7th storyNov sent out
Dec 27, 2022Section 27-2048 adm code paint or post a sign indicating floors electric outlet covers or caps at west wall at public hall, 6th storyNov sent out
Oct 24, 2022Section 27-2005 adm code refit door leading to stairwell <a> at west wall at public hall, 1st storyNot complied with
Oct 24, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the bulk head ceiling stairs <a> and <b> , 16th storyNot complied with
Oct 24, 2022Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNot complied with
Jul 26, 2022Section 27-2005 adm code refit door leading to stairwell ''a'' west wall at public hall, 1st storyNot complied with
Jul 11, 2022Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNot complied with
Nov 17, 2018Section 27-2005 adm code refit closet door in the 1st room from north at east located at apt 7h, 7th story, 1st apartment from east at southNot complied with

Property Owners and Associates

Calynne Oyolokor
Officer
3.9(44)

44 Properties

13104 Units

Chamelle Reddick
Officer
2.7(2)

2 Properties

268 Units

Clayton Apts Inc
Corporate Owner
0(0)

1 Property

160 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet