230 West 147 Street,Manhattan, NY 10039

100 Units

Built in 1910

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
515 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 198 violations which is 1.98 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
28Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
96Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
74Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 13, 2024§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 4e, 4th story, 1st apartment from east at southNov sent out
Apr 11, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom , the foyer located at apt 4k, 4th story, 1st apartment from east at southNov sent out
Apr 04, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls in the bathroom located at apt 1r, 2nd story, 4th apartment from west at northNov certified on time
Apr 04, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from north located at apt 5b, 5th story, 2nd apartment from west at northNov certified on time
Apr 04, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 5b, 5th story, 2nd apartment from west at northNov certified on time
Mar 28, 2024§ 27-2026 adm code replace the broken or defective washbasin in the bathroom located at apt 1p, 2nd story, 2nd apartment from west at northNov certified on time
Mar 28, 2024§ 27-2011 adm code cleanse to the satisfaction of this department the mold at ceramic tile east wall in the bathroom located at apt 1p, 2nd story, 2nd apartment from west at northNov certified on time
Mar 28, 2024§ 27-2026 adm code replace the broken or defective water-closet in the bathroom located at apt 1p, 2nd story, 2nd apartment from west at northNov certified on time
Mar 28, 2024§ 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 1p, 2nd story, 2nd apartment from west at northNov certified on time
Mar 28, 2024§ 27-2005 adm code properly repair with similar material the broken or defective porcelain glazed enamel finish at interior surface of bathtub in the bathroom located at apt 1p, 2nd story, 2nd apartment from west at northNov certified on time
Mar 28, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling, east and north wall in the bathroom located at apt 1p, 2nd story, 2nd apartment from west at northNov certified on time
Mar 28, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation the steam riser pipe in the bathroom located at apt 1p, 2nd story, 2nd apartment from west at northNov certified on time
Mar 24, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling north and east wall in the kitchen located at apt 1p, 2nd story, 2nd apartment from west at northNov certified on time
Mar 14, 2024§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 4e, 5th story, 1st apartment from east at southNov certified on time
Mar 06, 2024§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 1p, 1st story, 2nd apartment from west at northNov certified on time
Mar 06, 2024§ 27-2005 hmc: properly repair or replace the broken or defective ceramic floor tile in the bathroom located at apt 1p, 1st story, 2nd apartment from west at northNov certified on time
Mar 06, 2024§ 27-2005 adm code replace with new the missing basin at south wall in the bathroom located at apt 1p, 1st story, 2nd apartment from west at northNov certified on time
Mar 06, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1p, 1st story, 2nd apartment from west at northNov certified on time
Mar 06, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all ceilings and walls in the entire apartment located at apt 1p, 1st story, 2nd apartment from west at northNov certified on time
Feb 23, 2024§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration electric range in the kitchen located at apt 5p, 5th story, 2nd apartment from west at north , section at westNot complied with
Jan 23, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 7 square feet at window frame at north wall in the 1st room from north located at apt 5p, 5th story, 2nd apartment from west at north , section at westNot complied with
Jan 23, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at east wall approximately 5 sq. ft. in the kitchen located at apt 5p, 5th story, 2nd apartment from west at north , section at westNot complied with
Jan 23, 2024§ 27-2005 adm code properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 5p, 5th story, 2nd apartment from west at north , section at westNot complied with
Jan 22, 2024§ 27-2005 adm code replace with new the missing escutcheon plate at ceiling and floor at riser in the bathroom located at apt 2b, 2nd story, 2nd apartment from west at northNov certified on time
Jan 22, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at window frame approximately 5 sq. ft. in the bathroom located at apt 2e, 2nd story, 1st apartment from east at southNov certified on time
Jan 24, 2022§ 27-2005 adm code replace with new the missing escutcheon plate at top of heat riser in the kitchen located at apt 5p, 5th story, 2nd apartment from south at west , section at westNot complied with
Oct 23, 2017§ 27-2005 adm code properly repair with similar material the broken or defective caulking around the bathtub area in the bathroom located at apt 2g, 2nd story, 3rd apartment from east at southFirst no access to re- inspect violation
Aug 19, 2015§ 27-2005 adm code refit apt. entrance door in the foyer located at apt 5j, 5th story, 1st apartment from south at westNot complied with

Property Owners and Associates

Michael Daniel
Site Manager, Head Officer
2.8(25)

3 Properties

153 Units

Remik Holdings LLC
Agent, Corporate Owner
2.7(9)

1 Property

100 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Roaches, garbage filled alley, infestations
Former Tenant
Pros:
There was almost no pros (c) openigloo to livin...
Cons:
This was the first NYC (c) openigloo apartment ...
Advice to owner:
Demonstrate more respect for your tenants inste...
Responsive super, bustling neighborhood
Former Tenant
Pros:
Building is fairly well maintained. (c) openigl...
Cons:
Plumbing definitely needs work. Will (c) openig...
Advice to owner:
Fix the plumbing and control the rat situation ...
Terrible building
Former Tenant
Pros:
Cheap rent but not worth (c) openigloo the stress
Cons:
Roaches, mice, packages stolen every (c) openig...
Advice to owner:
Burn the building
Neither here not there.
Former Tenant
Pros:
Great neighbors and great sunlight.
Cons:
Lived about 1.5 years there (c) openigloo witho...
Advice to owner:
Do better please.
I’m not even sure why i lived here as long as i did
Former Tenant
Pros:
Great location. Pre war building. (c) openigloo...
Cons:
Super is sweet but over (c) openigloo worked. W...
Advice to owner:
Be more responsive
2 gas leaks in 3 years. Gas work cheap and holes not sealed. Roaches and mice.
Former Tenant
Pros:
Location, location, location. Easy access (c) o...
Cons:
Cleanliness. Lack of landlord caring. (c) openi...
Advice to owner:
Get the building in shape. 6 months without gas...
It was ok until the roaches
Former Tenant
Pros:
In my unit all the (c) openigloo rooms had wind...
Cons:
Gas for cooking was cut (c) openigloo off multi...
Advice to owner:
Be more responsive to tenant issues.
Happy to have moved out
Former Tenant
Pros:
Wide stair case.
Cons:
Bed bugs infestations, rodent infestations, (c)...
Advice to owner:
Take care of infestations properly, don’t blame...
Better, not Best
Former Tenant
Pros:
1. Spacious Rooms, for the (c) openigloo area 2...
Cons:
The small things wrong with (c) openigloo the a...
Advice to owner:
If you want your rent on time, please don’t lea...