9 Post Avenue,Manhattan, NY 10034

48 Units

Built in 1920

5 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
98 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 76 violations which is 1.58 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
17Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
30Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
29Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Feb 29, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 4c, 4th story, 1st apartment from north at eastNov sent out
Feb 29, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the bathroom located at apt 4c, 4th story, 1st apartment from north at eastNov sent out
Nov 09, 2023§ 27-2026 adm code repair the leaky and/or defective faucets at the sink in the kitchen located at apt 4g, 4th story, 1st apartment from west at northNov sent out
Nov 09, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 4g, 4th story, 1st apartment from west at northNov sent out
Nov 09, 2023§ 27-2005 hmc: refit base cabinet door on south wall in the kitchen located at apt 4g, 4th story, 1st apartment from west at northNov sent out
May 11, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 4g, 4th story, 1st apartment from west at north , section ''9'', 1st from north at eastNov sent out
Mar 27, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the baseboard at south wall in the 5th room from north located at apt 4e, 4th story, 2nd apartment from west at northNov sent out
Jan 15, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen located at apt 4e, 4th story, 2nd apartment from west at northNov sent out
May 27, 2022Section 27-2005 adm code refit metal door at vestibuleNot complied with
May 27, 2022Section 27-2005 adm code refit entrance door to lobby , 1st storyNot complied with
Aug 24, 2021Section 27-2005 adm code properly repair with similar material the broken or defective sloping wood floor in the 1st private hallway located at apt 4e, 4th story, 1st apartment from west at northNot complied with
Aug 20, 2021Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration dumbwaiter converted into pantry at south wall in the kitchen located at apt 2i, 2nd story, 2nd apartment from east at south , section at eastNot complied with
Jan 16, 2020Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration dumbwaiter being used as pantry in the kitchen located at apt 4a, 4th story, 2nd apartment from east at south , section ''west''Not complied with
Jan 16, 2020Section 27-2005 adm code properly repair with similar material the broken or defective porcelain finish enamel glaze at bathtub in the bathroom located at apt 4a, 4th story, 2nd apartment from east at south , section ''west''Not complied with
Aug 19, 2019Section 27-2005 adm code properly repair with similar material the broken or defective pporcelan enamel glaze at surface of bathtiub in the bathroom located at apt 4a, 4th story, 2nd apartment from north at eastNot complied with
Mar 12, 2019Section 27-2005 adm code paint metal in accordance with dept. regulation heat riser pipe in the bathroom located at apt 4a, 4th story, 1st apartment from west at northNot complied with
Oct 07, 2015Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration the suspended celotex tile ceilings in the entire apartment located at apt 3f, 3rd story, 2nd apartment from west at northNot complied with

Property Owners and Associates

711-713 West 180th Holding LP
Owner, Corporate Owner
2.7(25)

32 Properties

1006 Units

9-15 Post Holding LLC
Owner, Corporate Owner
2.6(1)

2 Properties

68 Units

Barberry Rose Management
Agent
3.3(6)

4 Properties

117 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Sometimes difficult to reach
Former Tenant
Pros:
Neighbors are kind and respectful, (c) openiglo...
Cons:
Very noisy, apt got flooded (c) openigloo by up...
Advice to owner:
Be more responsive to tenants.