Mar 01, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling apx 2sqft in the bathroom located at apt 1b, 1st story, 1st apartment from north at eastNotice of issuance sent to tenant
Feb 29, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 2 sq.ft at east wall in the bathroom located at apt 1b, 1st story, 1st apartment from north at eastNotice of issuance sent to tenant
Feb 19, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and all walls at roof bulkheadNov sent out
Dec 22, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from north at east located at apt 3c, 3rd story, 2nd apartment from north at eastCiv14 mailed
Nov 15, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department south wall in the 1st room from east located at apt 2d, 2nd story, 1st apartment from east at southNov sent out
Jul 07, 2022§ 27-2005 adm code refit upper cabinet door at east wall in the kitchen located at apt 1a, 1st story, 1st apartment from south at westNov sent out
Mar 23, 2021§ 27-2005 adm code refit the door to east yard at public hall, 1st storyNov sent out
Mar 15, 2021§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 1a, 1st story, 1st apartment from south at westNot complied with
Nov 27, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department aii walls in the 2nd room from north located at apt 1a, 1st story, 1st apartment from south at westNov certified late
Nov 27, 2019§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the 4th room from north located at apt 1a, 1st story, 1st apartment from south at westNov certified late
Nov 23, 2019§ 27-2026 adm code repair the leaky and/or defective faucets at washbasin in the 3rd bathroom from north located at apt 1a, 1st story, 2nd apartment from north at eastInvalid certification
Nov 23, 2019§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 1a, 1st story, 2nd apartment from north at eastNov sent out
Nov 23, 2019§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 3rd room from north located at apt 1a, 1st story, 2nd apartment from north at eastNov sent out
Sep 06, 2018§ 27-2005 adm code properly secure the loose newell post at public hall stairs, 1st storyNot complied with
Sep 07, 2017§ 27-2005 adm code properly repair the broken or defective bell/buzzer/intercom system at west wall in the 4th room from north located at apt 4b, 4th story, 1st apartment from north at eastNov certified late
Mar 12, 2015§ 27-2005 adm code properly secure the loose ceramic floor tiles in the 2nd bathroom from east at center located at apt 1c, 1st story, 1st apartment from east at southNov certified late