1726 Davidson Avenue,Bronx, NY 10453

72 Units

Built in 1927

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
545 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 424 violations which is 5.88 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
50Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
257Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
116Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Mar 01, 2024§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 5e, 5th story, 2nd apartment from north at east , 1st section from west at northNov sent out
Mar 01, 2024§ 27-2005 adm code properly repair with similar material the broken or defective wood base cabinet door at west wall in the kitchen located at apt 5e, 5th story, 2nd apartment from north at east , 1st section from west at northNov sent out
Mar 01, 2024§ 27-2005 hmc: properly repair or replace the broken or defective light fixture at ceiling in the 3rd room from east located at apt 5e, 5th story, 2nd apartment from north at east , 1st section from west at northNov sent out
Mar 01, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 6 sq ft at north wall in the bathroom located at apt 5d, 5th story, 4th apartment from north at eastNotice of issuance sent to tenant
Feb 23, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at east wall approx 5 sq. ft in the bathroom located at apt 1i, 1st story, 1st apartment from west at north , section at northNotice of issuance sent to tenant
Feb 12, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at south wall approx 5 sq.ft in the kitchen located at apt 3e, 3rd story, 3rd apartment from north at eastNotice of issuance sent to tenant
Feb 12, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling approx 3 sq.ft in the bathroom located at apt 2x, 2nd story, 1st apartment from east at southNotice of issuance sent to tenant
Feb 12, 2024§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the foyer located at apt 3e, 3rd story, 3rd apartment from north at eastNov sent out
Feb 12, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 5h, 5th story, 2nd apartment from west at northNov sent out
Feb 11, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at north and east wall in the bathroom located at apt 1l, 1st story, 3rd apartment from south at westNov sent out
Feb 11, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at window frame offset # 1 at west wall approx 7 sq.ft in the 1st room from east located at apt 1l, 1st story, 3rd apartment from south at westNotice of issuance sent to tenant
Feb 08, 2024§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 2x, 2nd story, 1st apartment from east at south , section at southNov sent out
Jan 10, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 2sq ft at ceiling in the private hallway from east at south located at apt 5j, 5th story, 3rd apartment from south at westFirst no access to re- inspect violation
Nov 29, 2023§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the kitchen located at apt 5g, 5th story, 1st apartment from north at eastFirst no access to re- inspect violation
Nov 29, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls, doors, door frames. window frames, and ceilings in the entire apartment located at apt 5g, 5th story, 1st apartment from north at eastFirst no access to re- inspect violation
Nov 13, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 1h, 1st story, 2nd apartment from west at north , section at northFirst no access to re- inspect violation
Nov 13, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 1h, 1st story, 2nd apartment from west at north , section at northFirst no access to re- inspect violation
Nov 13, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 1h, 1st story, 2nd apartment from west at north , section at northFirst no access to re- inspect violation
Nov 09, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation steam riser in the private hallway located at apt 1h, 1st story, 2nd apartment from west at north , section at northFirst no access to re- inspect violation
Nov 09, 2023§ 27-2005 hmc: properly repair or replace the broken or defective wood entrance door in the bathroom located at apt 1h, 1st story, 2nd apartment from west at north , section at northFirst no access to re- inspect violation
Nov 04, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling and at east wall in the private hallway located at apt 1i, 1st story, 1st apartment from west at north , section at northFirst no access to re- inspect violation
Oct 04, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and all walls in the entire apartment located at apt 5g, 5th story, 1st apartment from north at eastFirst no access to re- inspect violation
Oct 04, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 5g, 5th story, 1st apartment from north at eastFirst no access to re- inspect violation
Oct 01, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at south located at apt 1j., 1st story, 2nd apartment from south at westFirst no access to re- inspect violation
Oct 01, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at south, the bathroom , the 1st private hallway , the kitchen , the 1st room from east located at apt 1j., 1st story, 2nd apartment from south at westFirst no access to re- inspect violation
Oct 01, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1j., 1st story, 2nd apartment from south at westFirst no access to re- inspect violation
Jul 24, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling, in the entire apartment located at apt 5g, 5th story, 1st apartment from north at eastFirst no access to re- inspect violation
Jun 12, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from east at south located at apt 5g, 5th story, 1st apartment from north at eastFirst no access to re- inspect violation
Apr 11, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 3x, 3rd story, 1st apartment from east at southNot complied with
Mar 17, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and walls throughout in the entire apartment located at apt 6i, 6th story, 1st apartment from west at northNot complied with
Mar 13, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all ceilings in the entire apartment located at apt 1h, 1st story, 2nd apartment from west at northFirst no access to re- inspect violation
Mar 13, 2023§ 27-2026 adm code remove disused plumbing fixtures and properly seal pipe connections at sink at meter roomFirst no access to re- inspect violation
Mar 11, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation all radiators and riser pipes in the entire apartment located at apt 3k, 3rd story, 3rd apartment from south at westFirst no access to re- inspect violation
Mar 11, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 3i, 3rd story, 1st apartment from west at northNot complied with
Mar 11, 2023§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze at surface of bathtub in the bathroom located at apt 1g, 1st story, 1st apartment from north at eastFirst no access to re- inspect violation
Mar 11, 2023§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze at surface of bath tub in the bathroom located at apt 3a, 3rd story, 2nd apartment from south at westNot complied with
Mar 08, 2023§ 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at all stories at north stack building rear at fire escapeNot complied with
Mar 08, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and walls throughout in the entire apartment located at apt 5g, 5th story, 1st apartment from north at eastFirst no access to re- inspect violation
Mar 08, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and walls throughout in the entire apartment located at apt 6c, 6th story, 2nd apartment from east at southFirst no access to re- inspect violation
Mar 08, 2023§ 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at all stories at center stack building rear at fire escapeNot complied with
Mar 08, 2023§ 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at all stories at south stack building rear at fire escapeNot complied with
Mar 07, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and walls in the bathroom located at apt 4k, 4th story, 3rd apartment from south at westFirst no access to re- inspect violation
Oct 13, 2022§ 27-2005 adm code properly repair the broken or defective door bell and chime in the entrance located at apt 1h, 1st story, 2nd apartment from west at north , section ''north''First no access to re- inspect violation
Jun 01, 2022§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 1d, 1st story, 4th apartment from north at eastNot complied with
Oct 30, 2019§ 27-2005, 2007 adm code remove device preventing door from being self-closing fire doors at all stories at public hallNot complied with
May 15, 2019§ 27-2005 adm code refit doors at sink cabinet in the kitchen located at apt 3e, 3rd story, 3rd apartment from north at eastNot complied with
Sep 16, 2013§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st door from west at north wall, ceiling in the bathroom located at apt 6c, 6th story, 2nd apartment from east at southFirst no access to re- inspect violation
Sep 16, 2013§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st closet from east at south wall door, 1st closet from east at south wall door frame in the 3rd room from east at north located at apt 6c, 6th story, 2nd apartment from east at southFirst no access to re- inspect violation
Sep 16, 2013§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the private hallway located at apt 6c, 6th story, 2nd apartment from east at southFirst no access to re- inspect violation
Jan 17, 2013§ 27-2005 hmc:trace and repair the source and abate the nuisance consisting of mold ... at 1st window frame from west at north wall, 1st window frame from south at west wall in the 2nd room from east located at apt 1l, 1st story, 3rd apartment from south at westNot complied with

Property Owners and Associates

1726 Davidson LLC
Agent, Corporate Owner
2.4(2)

1 Property

72 Units

Anthony Ortega
Head Officer
2.4(2)

3 Properties

119 Units

Anthony Ortega
Site Manager, Officer
2.4(2)

9 Properties

196 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Old but OK
Former Tenant
Pros:
This building is prewar , (c) openigloo has lar...
Cons:
Another of people in and (c) openigloo out , lo...
Advice to owner:
Keep the front of the building clear
apartment review
Former Tenant
Pros:
The apartment is big and (c) openigloo spacious.
Cons:
Not the best area to (c) openigloo live in sinc...