1869 Eastern Parkway,Brooklyn, NY 11233

3 Units

Built in 1910

3 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
53 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 270 violations which is 90 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
43Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
158Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
68Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Jan 16, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the windowframe at east wall in the 1st room from north located at apt 2f, 2nd story, 1st apartment from east at southNov sent out
Jan 16, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the windowframe at east wall in the 2nd room from north at east located at apt 2f, 2nd story, 1st apartment from east at southNov sent out
Dec 01, 2022Section 27-2005 adm code paint metal in accordance with dept. regulation riser in the bathroom located at apt 3r, 3rd story, 1st apartment from south at westNov sent out
Dec 01, 2022Section 27-2026 adm code replace with new the defective flush pipe of water closet in the bathroom located at apt 3r, 3rd story, 1st apartment from south at westNov sent out
Aug 29, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from south at westNov sent out
Aug 03, 2022Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 2r, 2nd story, 1st apartment from south at westNov sent out
Aug 03, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 1st storyNov sent out
Apr 26, 2022Section 27-2005 adm code paint metal in accordance with dept. regulation the steam riser in the bathroom located at apt 3r, 3rd story, 1st apartment from south at westNov sent out
Oct 18, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and north and south walls at public hall, 1st storyNov sent out
Sep 13, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling;north wall and south wall at public hall, 1st storyNov sent out
Aug 31, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceilings at all stories at public hallNov sent out
Aug 26, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling , south and north walls at public hall, 1st storyNov sent out
May 27, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls at vestibule at public hall, 1st storyNov sent out
May 26, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall, south wall & the ceiling at public hall, 1st storyNov sent out
Feb 09, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from east at south located at apt 2r, 2nd story, 1st apartment from south at westNov sent out
Feb 04, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling, north and east walls in the 2nd room from east at south located at apt 2r, 2nd story, 1st apartment from south at westNov sent out
Feb 04, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at south wall in the 2nd room from east at north located at apt 2r, 2nd story, 1st apartment from south at westNov sent out
Jul 09, 2020Section 27-2005 adm code refit the west (rear) door to yard at public hall, 1st storyNov sent out
May 02, 2019Section 27-2005 adm code refit entry door in the building at public hall, 1st storyNov sent out
Aug 22, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and walls at public hall, 2nd storyNov sent out
Aug 22, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and walls at public hall, 1st storyNov sent out
May 26, 2018Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from south at westNov sent out
Apr 02, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt f2, 2nd story, 1st apartment from east at southNov sent out
Apr 02, 2018Section 27-2005 adm code properly repair with similar material the broken or defective vinyl tiles at floor at public hall, 1st storyNov sent out
Jan 27, 2018Section 27-2005 adm code properly repair with similar material the broken or defective wood floors in the entire apartment located at apt f2, 1st story, 1st apartment from east at southFirst no access to re- inspect violation
Jan 20, 2018Section 27-2005 adm code properly repair with similar material the broken or defective ..loose cracked vinyl floor tiles at public hall, 2nd storyNot complied with
Jan 02, 2018Section 27-2005 adm code refit door at building entrance. at public hall, 1st storyNot complied with
Jan 02, 2018Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st storyNot complied with
Nov 16, 2017Section 27-2005 adm code properly repair with similar material the broken or defective ..water damaged sheetrock at ceiling in the bathroom located at apt 2f, 2nd story, apartment at southNot complied with
Nov 16, 2017Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ..water damaged wall at east in the 1st room from east at south located at apt 2f, 2nd story, apartment at southNot complied with
Sep 15, 2017Section 27-2005 hmc:trace and repair the source and abate the nuisance consisting of mold ... at bathtub walls in the bathroom located at apt 3f, 3rd story, 1st apartment from east at southNot complied with
Sep 15, 2017Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNot complied with
Sep 15, 2017Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
Mar 27, 2017Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration ..wall erected at east, subdiving apartment in the entire apartment located at apt 2r, 2nd story, apartment at westFirst no access to re- inspect violation
Mar 16, 2017Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration ...apartment subdivided into 2 class a apartments in the entire apartment located at apt 3, 3rd story, apartment at southFirst no access to re- inspect violation
Mar 15, 2017Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration ..1 apartmment subdivided into 2 class a apartments in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at southFirst no access to re- inspect violation
Mar 15, 2017Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration ...apartment subdivided into 2 class a apartments in the entire apartment located at apt 1, 1st story, apartment at southFirst no access to re- inspect violation
Mar 10, 2017Section 27-2005 adm code properly repair with similar material the broken or defective fireretardant sheetrock at ceiling and walls, center section at public hall, 1st storyFirst no access to re- inspect violation
Mar 07, 2017Section 27-2005 adm code properly repair the broken or defective paving ..throughout at cellarFirst no access to re- inspect violation
Mar 07, 2017Section 27-2011 adm code cleanse to the satisfaction of this department the stairs and landings at all stories at public hallFirst no access to re- inspect violation
Mar 07, 2017Section 27-2005 adm code refit door leading to rear yard at public hall, 1st storyFirst no access to re- inspect violation
Jun 09, 2016Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyFirst no access to re- inspect violation
Jun 09, 2016Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st storyFirst no access to re- inspect violation

Property Owners and Associates

Chanoch Alperovitz
Head Officer
2.5(1)

2 Properties

6 Units

Eleuther Feldman
Site Manager
2.5(1)

1 Property

3 Units

Holland Management
Agent
2.5(3)

5 Properties

25 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

HORRIBLE building! Demolition is inevitable
Former Tenant
Pros:
NOTHING at all!
Cons:
Everything you can possibly think (c) openigloo...
Advice to owner:
Do better, you would not want to live like this...