Jun 16, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 5e, 5th story, 1st apartment from south at westNov sent out
Jun 16, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroom located at apt 5e, 5th story, 1st apartment from south at westNov sent out
Jun 05, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 5e, 5th story, 1st apartment from north at eastNov sent out
Mar 04, 2023Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partition erected from floor to ceiling in the 4th room from east located at apt 5e, 5th story, 1st apartment from south at westNov sent out
Feb 24, 2023Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Feb 21, 2023Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wall erected from floor to ceiling creating rooms for living in the 1st room from north located at apt 5e, 5th story, 1st apartment from south at westNov sent out
Feb 17, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at all walls at bulkhead to the roof at public hall, 6th storyNov sent out
Jul 28, 2022Section 27-2037, 2038 hmc: provide a safe and adequate supply of electric service to the fixtures at east wall electrical outlet in the foyer located at apt 5e, 5th story, 1st apartment from west at northNov sent out
Jul 12, 2022Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Jan 06, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the entire apartment located at apt 5h, 5th story, 2nd apartment from west at northNov sent out
Jan 06, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and all walls in the entire apartment located at apt 5h, 5th story, 2nd apartment from west at northNov sent out
Jun 20, 2018Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the entire apartment located at apt 4d, 4th story, 4th apartment from north at east , section at eastNov sent out