Jun 24, 2014Section 27-2005 adm code refit south 2 window in the 1st room from east located at apt 3b, 3rd story, 2nd apartment from east at southNov sent out
Jun 24, 2014Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 3b, 3rd story, 1st apartment from east at southNov sent out
Jun 24, 2014Section 27-2026 adm code repair leaky water closet flush pipe connection ... in the bathroom located at apt 3b, 3rd story, 1st apartment from east at southNov sent out
Jun 24, 2014Section 27-2005 adm code refit door in the entrance located at apt 3b, 3rd story, 2nd apartment from east at southNov sent out
Mar 27, 2014Section 27-2026 adm code repair leaky water closet flush pipe connection ... in the bathroom located at apt 3b, 3rd story, 1st apartment from east at southNov sent out
Mar 27, 2014Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and walls throughout in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at southNov sent out