23-6 Steinway Street,Queens, NY 11105

18 Units

Built in 1928

4 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
50 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 120 violations which is 6.66 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
39Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
65Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
15Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Apr 12, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Sep 26, 2023§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze of bathtub in the bathroom located at apt c1, 3rd story, 2nd apartment from west at northNov sent out
Sep 26, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all wall and ceiling in the 2nd room from north located at apt c1, 3rd story, 2nd apartment from west at northNov sent out
Sep 26, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all wall and ceiling in the private hallway located at apt c1, 3rd story, 2nd apartment from west at northNov sent out
Sep 26, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen located at apt c1, 3rd story, 2nd apartment from west at northNov sent out
Sep 26, 2023§ 27-2013 adm code remove the dirty and/or loose paper and repaper or paint to the satisfaction of this department all walls and ceiling in the foyer located at apt c1, 3rd story, 2nd apartment from west at northNov sent out
Sep 26, 2023§ 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.Nov sent out
Sep 26, 2023§ 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.Nov sent out
Sep 26, 2023§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Sep 26, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling at vestibule at public hall, 1st storyNov sent out
Sep 26, 2023§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st storyNov sent out
Sep 26, 2023§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant material the east and south wall at vestibule at public hall, 1st storyNov sent out
Sep 26, 2023§ 27-2005 adm code replace with new the missing heat riser pipe escutcheon plate at ceiling in the bathroom located at apt c1, 3rd story, 2nd apartment from west at northNov sent out
Mar 27, 2023(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd's website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Oct 16, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt c1, 3rd story, 2nd apartment from north at eastNov sent out
Oct 16, 2022Section 27-2005 adm code properly repair with similar material the broken or defective wood floor in the private hallway located at apt c1, 3rd story, 2nd apartment from north at eastNov sent out
Mar 02, 2022(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Oct 14, 2021Section 27-2005 adm code properly repair with similar material the broken or defective ceramic tile floor. in the bathroom located at apt c1, 3rd story, 2nd apartment from west at northNov sent out
Oct 14, 2021Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing. at public hall, 1st storyNov sent out
Apr 14, 2021(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Mar 20, 2019Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st storyNov sent out
Mar 20, 2019Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Mar 20, 2019Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out
Mar 20, 2019Section 27-2005 adm code properly repair with similar material the broken or defective fire retardant plaster at east wall at public hall, 1st storyNov sent out
Mar 20, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at east wall at public hall, 1st storyNov sent out
Mar 20, 2019Section 27-2005 adm code properly repair the broken or defective upper sash at window at public hall, 2nd storyNov sent out
Dec 18, 2018Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Dec 18, 2018Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out
Dec 18, 2018Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing. at public hall, 1st storyNov sent out
Sep 20, 2018Section 27-2005 adm code refit vestibule door at public hall, 1st storyNov sent out
Jun 29, 2018Section 27-2005 adm code refit apt door in the entrance located at apt c1, 3rd story, 2nd apartment from south at westNov sent out
Jun 29, 2018Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Jun 29, 2018Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out
Jun 29, 2018Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st storyNov sent out
Jul 26, 2017Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out
Jul 26, 2017Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Jul 26, 2017Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st storyNov sent out
Jun 06, 2016Section 27-2005 adm code refit the door to the building entranceNov sent out
Jun 06, 2016Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency''s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out

Property Owners and Associates

Jag 23rd Realty, LLC
Owner, Corporate Owner
0(0)

1 Property

18 Units

Philip Guinta
Agent, Head Officer
0(0)

1 Property

18 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet