Dec 22, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx.8 sq.ft at ceiling and north and west wall in the bathroom located at apt 24a, 24th story, 1st apartment from south at westNotice of issuance sent to tenant
Dec 22, 2023§ 27-2005 hmc: refit door at entrance in the 1st room from north at east located at apt 24a, 24th story, 1st apartment from south at westNov sent out
Sep 12, 2023§ 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNov sent out
Oct 27, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 3l, 3rd story, 7th apartment from east at southNov sent out
Oct 27, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 3l, 3rd story, 7th apartment from east at southNov sent out
Oct 27, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east located at apt 3l, 3rd story, 7th apartment from east at southNov sent out
Oct 04, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 8c, 8th story, 1st apartment from south at westNov sent out
Sep 27, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the bathroom located at apt 22d, 22nd story, 2nd apartment from east at south , section ''north''Nov sent out
Sep 19, 2022Section 27-2005 adm code replace with new the broken or defective wash basin cabinet in the bathroom located at apt 10c, 10th story, 1st apartment from west at northNov sent out
Sep 14, 2022Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3l, 3rd story, 7th apartment from east at southNov sent out
Sep 14, 2022Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3l, 3rd story, 7th apartment from east at southNov sent out
Sep 14, 2022Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 3l, 3rd story, 7th apartment from east at southNov sent out
Sep 14, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department wall and ceiling in the entire apartment located at apt 24a, 24th storyNov sent out
Sep 14, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt 24g, 24th storyNov sent out
Sep 14, 2022Section 27-2005 adm code properly repair the broken or defective counter top at sink in the kitchen located at apt 24g, 24th storyNov sent out
Sep 13, 2022Section 27-2005 adm code replace with new the broken or defective refrigerator door gasket in the kitchen located at apt 5f, 5th story, 1st apartment from west at northNov sent out
Aug 17, 2022Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 29d, 29th story, 1st apartment from east at southNov sent out
Aug 17, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 29d, 29th story, 1st apartment from east at southNov sent out
Aug 17, 2022Section 27-2005 adm code properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 29d, 29th story, 1st apartment from east at southNov sent out
Jun 03, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the entire apartment located at apt 16g, 16th story, 3rd apartment from west at northNot complied with
Mar 30, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department south wall by intercom in the foyer located at apt 24a, 24th story, 2nd apartment from south at westNot complied with
Feb 16, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north located at apt 28d, 28th story, 2nd apartment from east at southSecond no access to re-inspect violation
Jul 12, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ... all walls and ceilings in the entire apartment located at apt 5a, 5th story, 1st apartment from north at eastFirst no access to re- inspect violation
Jul 12, 2019Section 27-2005 adm code properly repair the broken or defective ... vinyl floor tiles that have missing pieces in the entire apartment located at apt 5a, 5th story, 1st apartment from north at eastFirst no access to re- inspect violation
Jul 06, 2016Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the walls in the entire apartment located at apt 20g, 20th story, 2nd apartment from west at northNot complied with
Jul 06, 2016Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the walls and the ceiliing in the 2nd room from north at east located at apt 21a, 21st story, apartment at eastFirst no access to re- inspect violation