Apr 02, 2024§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 5s, 5th story, 2nd apartment from east at southNov sent out
Feb 08, 2024§27-2153 adm code post and maintain a notice, written in english and in spanish, on the building entrance door or other conspicuous location in the building common area, stating that: (1) the building is in the alternative enforcement program, (2) that occupants may call 311 or the aep at 212-863-8262 to report housing maintenance complaints, (3) the name, telephone, and address of the owner, and, (4) the identity of any financial institution that holds a mortgage on the property. post at public hall, 1st storyNov sent out
Jan 30, 2024§ 27-2005 hmc: properly repair or replace the broken or defective upper escutcheon plate at west one riser in the 2nd room from north at west located at apt 6w, 6th story, 1st apartment from south at westNov sent out
Jan 30, 2024§ 27-2005 hmc: properly repair or replace the broken or defective ventilation system in the bathroom located at apt 6w, 6th story, 1st apartment from south at westNov sent out
Jan 30, 2024§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 6w, 6th story, 1st apartment from south at westNov sent out
Jan 30, 2024§ 27-2005 hmc: properly repair or replace the broken or defective upper escutcheon plate at north 1 riser in the 1st room from north located at apt 6w, 6th story, 1st apartment from south at westNov sent out
Jan 30, 2024§ 27-2037, 2038 hmc: provide a safe and adequate supply of electric service to the fixtures ceiling fan in the 1st room from north located at apt 6w, 6th story, 1st apartment from south at westNov sent out
Jan 30, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from north at west located at apt 6w, 6th story, 1st apartment from south at westNov sent out
Dec 29, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls in the private hallway located at apt 3s, 3rd story, 2nd apartment from east at southNov sent out
Dec 22, 2023§ 27-2005 hmc: refit the lower window sash at east wall in the 3rd room from north located at apt 5se, 5th story, 1st apartment from east at southViolation will be reinspected
Dec 22, 2023§ 27-2005 adm code properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 4se, 4th story, 1st apartment from east at southViolation will be reinspected
Dec 22, 2023§ 27-2005 hmc: properly repair or replace the broken or defective escutcheon plate at ceiling at heat riser in the 3rd room from north located at apt 4se, 4th story, 1st apartment from east at southViolation will be reinspected
Nov 06, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 5se, 5th story, 1st apartment from east at southNov sent out
Nov 06, 2023§ 27-2005 hmc: properly repair or replace the broken or defective gasket at refrigerator door in the kitchen located at apt 5se, 5th story, 1st apartment from east at southViolation will be reinspected
Sep 27, 2023§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 5s, 5th story, 2nd apartment from east at southNot complied with
Apr 12, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor covering in the kitchen located at apt 5s, 5th story, 2nd apartment from east at southNot complied with
Apr 12, 2023§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration ...drop ceiling made of suspended accoustic panels in the kitchen located at apt 3n, 3rd story, 1st apartment from west at northFirst no access to re- inspect violation
Mar 30, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ...vinyl floor covering in the kitchen located at apt 5s, 5th story, 2nd apartment from east at southNot complied with
Oct 18, 2022§ 27-2005 adm code properly repair the broken or defective inoperative bell and return buzzer system from 1st story public hall to west wall in the foyer located at apt 7e, 7th story, 1st apartment from north at eastNot complied with
Jun 14, 2022§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 5s, 5th story, 1st apartment from east at southNot complied with