271 West 146 Street,Manhattan, NY 10039

20 Units

Built in 1920

5 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
174 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 288 violations which is 14.4 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
51Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
185Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
52Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 19, 2024§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant material at south wall at public hall, 1st storyNov sent out
Apr 19, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th storyNov sent out
Apr 19, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and west, south walls at bulkhead , 5th storyNov sent out
Apr 19, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation at riser in the bathroom located at apt 10, 3rd story, 2nd apartment from north at eastNov sent out
Apr 02, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Apr 02, 2024§ 27-2005 adm code replace with new the missing outlet cover at west wall in the 1st room from north located at apt 12, 3rd story, 2nd apartment from south at westNov sent out
Apr 01, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department window frame in the bathroom located at apt 9, 3rd story, 1st apartment from south at westNov sent out
Apr 01, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 8 sq feet at west wall in the bathroom located at apt 9, 3rd story, 1st apartment from south at westNotice of issuance sent to tenant
Mar 28, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st door from west at north wall in the entrance located at apt 11, 3rd story, 1st apartment from north at eastNov sent out
Mar 28, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 11, 3rd story, 1st apartment from north at eastNov sent out
Mar 28, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the foyer located at apt 11, 3rd story, 1st apartment from north at eastNov sent out
Mar 28, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall in the 4th room from north located at apt 11, 3rd story, 1st apartment from north at eastNov sent out
Jan 30, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st door from east at south wall in the 4th room from north located at apt 1, 1st story, 2nd apartment from north at eastNov sent out
Dec 22, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st door from south at west wall in the foyer located at apt 1, 1st story, 2nd apartment from north at eastNov sent out
Dec 22, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from north located at apt 1, 1st story, 2nd apartment from north at eastNov sent out
Dec 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceilings and all walls throughout at public hallNov sent out
Dec 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 5th storyNov sent out
Dec 19, 2023§ 27-2005 adm code replace with new the missing outlet cover at west wall in the 1st room from north located at apt 12, 3rd story, 2nd apartment from south at westNov sent out
Dec 19, 2023§ 27-2005 adm code replace with new the missing outlet cover at north wall in the 1st room from north located at apt 12, 3rd story, 2nd apartment from south at westNov sent out
Dec 19, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, all walls and trim throughout in the entire apartment located at apt 16, 4th story, 2nd apartment from south at westNov sent out
Oct 17, 2023§ 27-2005 hmc: properly repair or replace the broken or defective cabinet doors base cabinet at sink in the kitchen located at apt 9, 3rd story, 2nd apartment from east at southNov sent out
Oct 07, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the south wall at public hall, 1st storyNov sent out
Oct 07, 2023§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroom located at apt 12, 3rd story, 2nd apartment from south at westNov sent out
Jun 19, 2023§ 27-2005 hmc: properly repair or replace the broken or defective mailbox at building vestibule , 1st storyNov sent out
Jun 19, 2023§ 27-2005 hmc: properly repair or replace the broken or defective escutcheon plate at riser in the bathroom located at apt 11, 3rd story, 1st apartment from north at eastNov sent out
Mar 16, 2023(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd's website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Nov 03, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north, the kitchen , the foyer , the bathroom located at apt 6, 2nd story, 2nd apartment from north at eastNov sent out
Oct 19, 2022Section 27-2005 adm code paint metal in accordance with dept. regulation heat riser in the bathroom located at apt 3, 1st storyNov sent out
Oct 11, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east, the foyer , the bathroom located at apt 5, 2nd story, 1st apartment from east at southNov sent out
Jul 12, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the foyer , the bathroom located at apt 11, 3rd story, 1st apartment from north at eastNov sent out
Jun 24, 2022Section 27-2005 adm code replace with new the broken or defective top escutcheon plate at riser in the 1st room from north located at apt 3, 1st story, 1st apartment from north at eastNov sent out
Jun 24, 2022Section 27-2005 adm code refit 1st lower sash window from east at north in the 1st room from north located at apt 3, 1st story, 1st apartment from north at eastNov sent out
Feb 16, 2022(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd's website, www.nyc.gov\hpd, search bed bugs.First no access to re- inspect violation
Nov 11, 2021Section 27-2005 adm code paint metal in accordance with dept. regulation riser in the bathroom located at apt 3, 1st story, 1st apartment from north at eastNot complied with
Jun 10, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceilings from 1st story up to bulkhead at public hallNot complied with
Mar 01, 2021Section 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
Mar 01, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and walls in the entire apartment located at apt 2, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
Mar 01, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
Mar 01, 2021Section 27-2005 adm code properly repair the broken or defective electrical light fixture at ceiling in the foyer located at apt 8, 2nd story, 2nd apartment from south at westFirst no access to re- inspect violation
Feb 22, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 5th storyNot complied with
Feb 22, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at bulkhead at public hall, 5th storyNot complied with
Feb 22, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd storyNot complied with
Feb 22, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls in the bathroom located at apt 2, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
Feb 22, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the wall at east in the kitchen located at apt 2, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
Feb 22, 2021Section 27-2005 adm code paint metal in accordance with dept. regulation the riser pipe in the bathroom located at apt 2, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
Feb 22, 2021Section 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze at bath tub in the bathroom located at apt 2, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
Jun 15, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the south wall in the 1st room from north located at apt 8, 2nd story, 2nd apartment from south at westFirst no access to re- inspect violation
Jun 27, 2016Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and all walls in the 1st room from north located at apt 2, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
Jun 27, 2016Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and all walls in the 4th room from north located at apt 2, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
Nov 12, 2015Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all ceilings and all walls throughout in the entire apartment located at apt 2, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
Oct 24, 2014Section 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling , in the entire apartment located at apt 2, 1st story, 1st apartment from south at westFirst no access to re- inspect violation

Property Owners and Associates

146th Apartments LLC
Owner, Corporate Owner
2.4(15)

12 Properties

245 Units

176th Apts LLC
Owner, Corporate Owner
1.3(1)

3 Properties

80 Units

2500 Bedford LLC
Owner, Corporate Owner
1.3(1)

2 Properties

42 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Bad 4 U
Former Tenant
Pros:
I liked that the building (c) openigloo didn’t ...
Cons:
Do you have time for (c) openigloo a tome the s...
Advice to owner:
Quit your day job and garner a Soul at some poi...