82 Rutgers Slip,Manhattan, NY 10002

198 Units

Built in 1995

21 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
69 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 20 violations which is 0.1 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
9Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
6Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
5Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 01, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Jan 22, 2024§ 27-2005 hmc: properly repair or replace the broken or defective mortise lock in the entrance located at apt 11f, 11th story, 1st apartment from east at southCiv14 mailed
Jan 22, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 12a, 12th story, 1st apartment from west at northNov sent out
Jan 22, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling approx. 3 sq. feet in the bathroom located at apt 12a, 12th story, 1st apartment from west at northNotice of issuance sent to tenant
Jan 22, 2024§ 27-2005 hmc: properly repair or replace the broken or defective 2nd door at wood base cabinet at south wall in the kitchen located at apt 12a, 12th story, 1st apartment from west at northCiv14 mailed
Jan 22, 2024§ 27-2005 hmc: refit window upper and lower sash at south wall in the 1st room from east located at apt 14f, 14th story, 1st apartment from east at southNov sent out
Jan 22, 2024§ 27-2005 adm code properly repair with similar material the broken or defective wood floor tile in the private hallway located at apt 15h, 15th story, 3rd apartment from east at southCiv14 mailed
Jan 22, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color all walls in the private hallway located at apt 15h, 15th story, 3rd apartment from east at southCiv14 mailed
Jan 22, 2024§ 27-2005 hmc: properly repair or replace the broken or defective light switch at east wall in the foyer located at apt 14f, 14th story, 1st apartment from east at southCiv14 mailed

Property Owners and Associates

2bt Housing Development Fund Corporation
Owner
0(0)

1 Property

198 Units

Alexa Sewell
Head Officer
0(0)

5 Properties

442 Units

Grc Management
Agent
3.7(39)

99 Properties

3081 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet