757 East 138 Street,Bronx, NY 10454

114 Units

Built in 1905

6 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
224 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 244 violations which is 2.14 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
95Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
79Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
70Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 02, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Mar 10, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling and all walls approx. 6 sq. feet. in the bathroom located at apt 5a, 5th story, 1st apartment from west at northNotice of issuance sent to tenant
Mar 10, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at north wall in the 2nd room from east located at apt 5a, 5th story, 1st apartment from west at northNov sent out
Mar 10, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from east located at apt 5a, 5th story, 1st apartment from west at northNov sent out
Mar 10, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at north wall approx. 6 sq. feet in the 2nd room from east located at apt 5a, 5th story, 1st apartment from west at northNotice of issuance sent to tenant
Mar 04, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the 1st room from north located at apt 5a, 5th story, 1st apartment from west at northNov sent out
Feb 27, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at north 1 window casing ( approx 4 sqft) in the 2nd room from east located at apt 5a, 5th story, 1st apartment from west at north , section ''west''Notice of issuance sent to tenant
Feb 27, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at north 2 window casing ( approx 2 sqft) in the 2nd room from east located at apt 5a, 5th story, 1st apartment from west at north , section ''west''Notice of issuance sent to tenant
Feb 27, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at north 3 window casing ( approx 2 sqft) in the 2nd room from east located at apt 5a, 5th story, 1st apartment from west at north , section ''west''Notice of issuance sent to tenant
Feb 27, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at north wall ( approx 2 sqft) in the 2nd room from east located at apt 5a, 5th story, 1st apartment from west at north , section ''west''Notice of issuance sent to tenant
Jan 17, 2024§ 27-2005 hmc: properly repair or replace the broken or defective electrical light switch cover plate in the bathroom located at apt 2a, 2nd story, 1st apartment from west at northNov sent out
Jan 17, 2024§ 27-2005 adm code replace with new the missing electrical outlet cover plate at north wall in the 1st room from north located at apt 2a, 2nd story, 1st apartment from west at northNov sent out
Jan 04, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... aprox 6 sq ft at ceiling in the bathroom located at apt 5a, 5th story, 1st apartment from west at northNotice of issuance sent to tenant
Jan 04, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 5a, 5th story, 1st apartment from west at northNov sent out
Jan 04, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 5b, 5th story, 1st apartment from north at eastNov sent out
Jan 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 1t, 1st story, 1st apartment from north at eastNov sent out
Jan 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department wall at north inside compactor closet at public hall, 6th storyNov sent out
Jan 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department wall at south and east at cellarNov sent out
Jan 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the 3rd room from north located at apt 6q, 6th story, 1st apartment from east at southNov sent out
Jan 02, 2024§ 27-2005 hmc: properly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchenette located at apt 6q, 6th story, 1st apartment from east at southNov sent out
Jan 02, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at the east wall, approximately 2 sq ft. in the 1st room from north located at apt 6m, 6th story, 1st apartment from west at northNotice of issuance sent to tenant
Jan 02, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color east wall near windows and ceiling in the 1st room from east located at apt 6b, 6th story, 1st apartment from west at northNov sent out
Jan 02, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 5s, 5th story, 2nd apartment from north at eastNov sent out
Jan 02, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling near windows in the 1st room from east located at apt 5s, 5th story, 2nd apartment from north at eastNov sent out
Jan 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling in the 1st room from east located at apt 1t, 1st story, 1st apartment from north at eastNov sent out
Jan 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt 1s, 1st story, 2nd apartment from west at northNov sent out
Jan 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 1a, 1st story, 1st apartment from west at northNov sent out
Jan 02, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at north wall, approximately 1 sq ft. at public hall, 6th storyNov sent out
Jan 02, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling and north walls, approximately 1 sq ft at public hall, 5th story, section at eastNov sent out
Jan 02, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at north and south walls, approximately 5 sq ft. at public hall, 6th storyNov sent out
Jan 02, 2024§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant wall at east, at west public hall stairs , 6th storyNov sent out
Jan 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department east wall at west public hall stairs , 6th storyNov sent out
Jan 02, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at south wall, approximately 4 sq ft. , 6th storyNov sent out
Jan 02, 2024§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant wall at west at west public hall bulkheadNov sent out
Jan 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling at public hall, 6th story, section at westNov sent out
Jan 02, 2024§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant wall at north inside compactor closet at public hall, 6th storyNov sent out
Jan 02, 2024§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant wall near window 2nd from north at public hall, 6th story, section ''center''Nov sent out
Jan 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department west wall near window 2nd from north at public hall, 6th story, section ''center''Nov sent out
Jan 02, 2024§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant at north wall at east public hall stairs , 6th storyNov sent out
Jan 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department north wall at east public hall stairs , 6th storyNov sent out
Jan 02, 2024§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant ceiling and east wall at public hall , 5th storyNov sent out
Jan 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and wall at east , 5th storyNov sent out
Jan 02, 2024§ 27-2005 hmc: properly repair or replace the broken or defective latch at west public hall stair door , 5th storyNov sent out
Jan 02, 2024§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant wall at south and east at cellarNov sent out
Jan 02, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at the ceiling approx 2 sqft in the 1st room from north located at apt 6m, 6th story, 1st apartment from west at northNotice of issuance sent to tenant
Jan 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and wall at north near window casing, 1st from east. at public hall, 3rd storyNov sent out
Jan 02, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at north and south wall near window, approximately 5 sq ft. at public hall, 6th storyNov sent out
Jan 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department wall at west at west public hall bulkhead at roofNov sent out
Jan 02, 2024§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant ceiling at public hall, 6th story, section at westNov sent out
Jan 02, 2024§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant ceiling and wall at north near window casing, 1st from east. at public hall, 3rd storyNov sent out
Jan 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 6q, 6th story, 1st apartment from east at southNov sent out
Jan 02, 2024§ 27-2037, 2038 hmc: provide a safe and adequate supply of electric service to the fixtures at the ceiling in the kitchenette located at apt 6q, 6th story, 1st apartment from east at southNov sent out
Jan 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 1o, 1st story, 3rd apartment from east at southNov sent out
Dec 21, 2023§ 27-2005 hmc: properly repair or replace the broken or defective wood base cabinet at east wall in the kitchen located at apt 2c, 2nd story, 2nd apartment from north at eastNov sent out
Aug 27, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5a, 5th story, 1st apartment from west at northNot complied with
Aug 11, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall at public hall stairs, 6th story, section ''east''Not complied with
Aug 11, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall at public hall stairs, 1st story, section ''east''Not complied with
May 18, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at east wall at east section at public hall stairs, 6th storyNot complied with
May 18, 2023§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant material at east wall at east section at public hall stairs, 5th storyNot complied with
May 18, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall at public hall, 6th storyNot complied with
May 18, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall at public hall stairs, 5th storyNot complied with
May 18, 2023§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant material at east wall at west section at public hall, 6th storyNot complied with
May 18, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceilng and all walls in the entire apartment located at apt 6m, 6th story, 1st apartment from west at northNot complied with
May 18, 2023§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant material at east wall at east section at public hall stairs, 6th storyNot complied with
May 18, 2023§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant material at ceiling and west window frame at center section at public hall, 6th storyNot complied with
May 18, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and window frame at public hall, 6th storyNot complied with
Mar 16, 2023(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd's website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Mar 03, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 5a, 5th story, 1st apartment from south at westNot complied with
Mar 03, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from north located at apt 5a, 5th story, 1st apartment from south at westNot complied with
Mar 03, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the kitchenette located at apt 5a, 5th story, 1st apartment from south at westNot complied with
Oct 14, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the walls and ceiling in the entire apartment located at apt 6g, 6th story, 7th apartment from east at southNot complied with
Oct 14, 2022§ 27-2005 adm code properly repair the broken or defective electrical outlet at west wall in the 1st room from north located at apt 6e, 6th story, 9th apartment from east at southNot complied with
Oct 14, 2022§ 27-2005 adm code refit door in the entrance located at apt 5r, 5th story, 3rd apartment from north at eastNot complied with
Oct 14, 2022§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the 2nd and 3rd windows from west at north wall in the 1st room from east located at apt 6m, 6th story, 1st apartment from west at northNot complied with
Oct 14, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the entire apartment located at apt 5e, 5th story, 9th apartment from east at southNot complied with
Jul 26, 2022§ 27-2005 adm code properly repair the broken or defective bell buzzer at south wall in the 1st room from east located at apt 5a, 5th story, 1st apartment from west at northNot complied with
May 25, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling, in the room located at b-room 4b, 4th story, 1st b-room from north at eastSecond no access to re-inspect violation
May 20, 2022§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze surface finish on bathtub in the bathroom located at apt 5a, 5th story, 1st apartment from west at northNot complied with
Feb 17, 2022(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Oct 15, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls throughout in the entire apartment located at apt 4u, 4th story, 1st apartment from west at north , section ''east''Nov sent out
Oct 15, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls throughout in the entire apartment located at apt 4b, 4th story, 1st apartment from north at eastSecond no access to re-inspect violation
Oct 12, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls throughout in the entire apartment located at apt 6b, 6th story, 1st apartment from north at eastSecond no access to re-inspect violation
Oct 12, 2021§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the kitchenette located at apt 6j, 6th story, 3rd apartment from south at westNot complied with
Apr 02, 2021(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Jan 27, 2021§ 27-2011 adm code cleanse to the satisfaction of this department the floor in the room located at b-room 4b, 4th story, 1st b-room from north at eastSecond no access to re-inspect violation
Jan 11, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and west wall. in the 1st room from north located at apt 4u, 4th story, 1st apartment from west at northNot complied with
Jan 11, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls in the 1st room from east located at apt 5j, 5th story, 3rd apartment from north at eastFirst no access to re- inspect violation
Jan 11, 2021§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 6j, 6th story, 3rd apartment from north at eastNot complied with
Jul 29, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and all walls in the entire apartment located at apt 5j, 5th story, 3rd apartment from north at eastFirst no access to re- inspect violation
May 24, 2019Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak all walls and ceiling in the bathroom located at apt 1u, 1st story, 1st apartment from west at north , section ''east''Nov sent out
May 24, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 1u, 1st story, 1st apartment from west at north , section ''east''Nov sent out
May 24, 2019Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at east wall in the 1st room from east located at apt 1u, 1st story, 1st apartment from west at north , section ''east''Nov sent out
May 24, 2019Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at south wall in the 1st room from east located at apt 1u, 1st story, 1st apartment from west at north , section ''east''Nov sent out
May 24, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at east wall in the 1st room from east located at apt 1u, 1st story, 1st apartment from west at north , section ''east''Nov sent out
May 24, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at south wall in the 1st room from east located at apt 1u, 1st story, 1st apartment from west at north , section ''east''Nov sent out

Property Owners and Associates

Delilah Tyson
Head Officer
0(0)

2 Properties

137 Units

Delilah Tyson
Officer
0(0)

2 Properties

132 Units

Irving Blaney
Site Manager
0(0)

1 Property

114 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet