3081 Villa Avenue,Bronx, NY 10468

66 Units

Built in 1966

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
160 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 104 violations which is 1.57 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
25Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
59Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
20Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 17, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak behind south wall in the 4th room from east located at apt 6k, 6th story, 1st apartment from east at southNov sent out
Apr 17, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and east wall at public hall, 6th storyNov sent out
Apr 12, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling, east and west wall public hallway 6th storyNov sent out
Apr 03, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Mar 15, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and west wall at public hall, 6th storyNov sent out
Mar 15, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... ( approx. 6 sq. ft) around window frame in the 2nd room from east located at apt 6c, 6th story, 4th apartment from south at westNotice of issuance sent to tenant
Feb 09, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th storyNov sent out
Feb 09, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at east wall at public hall, 6th storyNov sent out
Feb 09, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 6g, 6th story, 2nd apartment from north at eastNov sent out
Feb 09, 2024§ 27-2005 hmc: properly repair or replace the broken or defective electrical light fixture at south wall in the bathroom located at apt 6g, 6th story, 2nd apartment from north at eastNov sent out
Feb 09, 2024§ 27-2005 adm code properly repair with similar material the broken or defective wood counter at sink in the kitchen located at apt 6g, 6th story, 2nd apartment from north at eastNov sent out
Feb 09, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 1d, 1st story, 4th apartment from south at westNov sent out
Feb 09, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling inside the closet in the 2nd room from north located at apt 1d, 1st story, 4th apartment from south at westNov sent out
Feb 09, 2024§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration compactor closet padlocked all storys at public hallNov sent out
Jan 30, 2024§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame broken at public hall, 1st storyNov sent out
Jan 30, 2024§ 27-2053 adm code post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st storyNov sent out
Jan 30, 2024§ 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Jan 30, 2024§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out
Jan 30, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling, north and east wall. at 2nd public hall bulkhead from north, 6th storyNov sent out
Jan 30, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling, west and east walls. at public hall, 6th storyNov sent out
Mar 17, 2023(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd's website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Sep 07, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the window header in the 3rd room from north located at apt 6a, 6th story, 2nd apartment from south at westNov sent out
Dec 02, 2020Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls inside the closet in the 1st room from north located at apt 6l, 6th story, 1st apartment from south at westNov sent out
Dec 02, 2020Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 6l, 6th story, 1st apartment from south at westNov sent out
Dec 02, 2020Section 27-2026 adm code repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 6l, 6th story, 1st apartment from south at westNov sent out

Property Owners and Associates

D And S Management
Agent
1.8(2)

1 Property

66 Units

Laura Goldstein
Head Officer
1.8(2)

3 Properties

191 Units

Pelham Homes Assoc
Owner, Corporate Owner
1.8(2)

3 Properties

191 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

What happens when a landlord doesn't care.
Former Tenant
Pros:
Great heat. Specially during the (c) openigloo ...
Cons:
Extremely dirty building with a (c) openigloo n...
Advice to owner:
My advice would be to sell the building if she ...
Owners don’t care about the tenants
Former Tenant
Pros:
Apartments are big.
Cons:
Owners do not put safety (c) openigloo precauti...
Advice to owner:
Answer your tenants! Help to maintain the bu...